
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
Estimate 18,000–45,000 TRY
In residential apartments, detached houses, and commercial office properties built across Istanbul over the past 20 to 40 years, crumbling cloth-insulated wires, unearthed two-prong socket loops, and overloaded junction splices introduce acute domestic fire and electrocution hazards. Today's high-draw culinary and climate appliances—such as multi-split air conditioners, tumble dryers, induction hobs, and electric water heaters—rapidly overwhelm vintage 1.5mm² aluminum or undersized copper runs designed decades ago solely for low-wattage incandescent lighting. Comprehensive electrical rewiring extends far beyond replacing decorative socket faceplates; it requires stripping obsolete runs from the main utility meter board to individual room outlets, pulling seamless 100% solid bare copper low-smoke zero-halogen (LSZH) NHXMH or N2XH cables through in-wall conduits, establishing dedicated radial circuits for heavy appliances, and installing certified modular consumer units equipped with 30 mA life-safety and 300 mA fire-protection RCDs. As the Asian Side's fastest and most reliable certified electrician network, coordinated from our central Pendik dispatch hub, we provide 24/7 on-demand response with certified technicians across Kadıköy, Üsküdar, Ümraniye, Ataşehir, Maltepe, Kartal, Pendik, Tuzla, Çekmeköy, Sancaktepe, Sultanbeyli, Beykoz, and Şile. When seeking an experienced electrician, all turnkey rewiring projects are structured room by room to minimize living space disruption, backed by our official 1 year workmanship guarantee and transparent upfront pricing. For urgent electrical loss, our nearest electrician and emergency electrician units arrive promptly.

Call a certified electrician
Asian side 24/7 emergency. European side by appointment. Arrival time is confirmed on the call.

Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
01 / 08
Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet
Clear warning signs experienced by homeowners in older properties include tingling electrical shocks when touching metallic appliance casings, audible sizzling and burning plastic smells from distribution boards, flickering room lights whenever heavy appliances cycle on, and frequent circuit breaker trips. In structures exceeding 30 years of age, in-wall cloth-covered or vulcanized rubber-insulated wires harden, dry out, and crack under ongoing thermal cycling, exposing live copper conductors to surrounding masonry and adjacent cores. This induces invisible micro-arcing, in-wall fire propagation, and unaccounted electric utility billing losses.
When undertaking a full rewiring project, conduit pathways are inspected using digital borescopes and flexible draw springs. Where buried in-wall PVC conduits remain intact, old decayed wires are extracted without plaster demolition and fresh Halogen-Free conductors pulled through using non-conductive pulling lubricants. Where conduits are blocked or collapsed, wall chasers equipped with vacuum extraction cut clean narrow chases, or architectural skirting trunking is deployed seamlessly with minimal dust and structural impact.
In modern residential electrical installations, occupant fire survival depends directly on conductor flame-retardancy classifications. We exclusively deploy certified Low-Smoke Zero-Halogen (LSZH) NHXMH and N2XH solid electrolytic copper cables from Hes Kablo, Nexans, or Prysmian that emit zero toxic acid gases and minimal smoke under open flames. Circuit cross-sections are strictly dimensioned: 3x1.5mm² for lighting branches; 3x2.5mm² for general socket rings; dedicated 3x2.5mm² or 3x4mm² for air conditioners, ovens, and water heaters; and 3x6mm² or three-phase 5x6mm²/5x10mm² for main consumer unit riser feeds.
International electrical color coding is strictly enforced across the entire installation: Brown, Black, or Grey for live phases; continuous Light Blue for operational neutral; and strictly Green-Yellow for protective earthing conductors. Hand-twisted tape splices inside junction boxes are entirely prohibited, replaced with genuine V0 flame-retardant Wago 221 lever connectors.
Over 70% of residential electrical fires originate from severe thermal overloads inside kitchens and bathrooms. Operating an air fryer, microwave oven, rapid kettle, dishwasher, and electric oven simultaneously draws continuous current exceeding 30 Amps. In our rewiring projects, kitchen loads are never combined onto a single run: dedicated 3x2.5mm² runs feed the oven (C16 breaker) and dishwasher (C16 breaker), countertop outlets are split into dual independent socket groups, and induction hobs receive heavy 3x4mm² wiring (C25 breaker), eliminating thermal hazards.
In bathrooms, rising shower humidity is sealed out by potting all ceiling junction boxes inside IP68 dielectric silicone gel enclosures. Washing machine, electric water heater, and whirlpool circuits terminate onto dedicated high-sensitivity 10mA or 30 mA RCBO breakers at the consumer panel, ensuring absolute shock protection on wet tiles.
When rewiring furnished and occupied properties, families worry about prolonged power outages and disruption. ElektrikçiGO certified technicians execute a structured 'Progressive Room Isolation Protocol': On Day One, a temporary safety board is commissioned to keep the refrigerator, broadband router, and essential lighting continuously powered. Work advances methodically through the living room, kitchen, bedrooms, and bathrooms; at the end of each working day, completed rooms are tested, energized, and cleaned, ensuring residents are never left in the dark overnight.
In modern open-plan offices, corporate plazas, and commercial premises, power and structured data infrastructure distribute across raised-floor cavities or ceiling cable tray grids. Heavy-duty IP44 modular floor boxes (Grommets) installed beneath workstations deliver clean mains power, isolated UPS lines, and dual Cat6 data drops to each desk. In multi-storey commercial towers, 160A–400A copper or aluminum busbar trunking risers provide modular plug-in tap-off disconnects for each floor.
Commercial distribution boards integrate power factor correction (PFC) capacitor banks with harmonic filters, alongside fire alarm trip relays that instantly isolate HVAC ventilation systems during emergency evacuations.
As the certified ElektrikçiGO electrician network, we deliver complete apartment, villa, and commercial electrical rewiring projects across all districts of Istanbul's Asian Side with certified technicians. Every wiring run, panel assembly, junction overhaul, and earthing installation carries our official 1 Year Workmanship Guarantee. Work begins only after a transparent written project specification and fixed price quote are approved, with zero surprise cost additions throughout the project.
Upon project handover, every wall socket undergoes loop impedance verification, live-neutral voltage balancing, and 30 mA RCD trip speed certification using Fluke digital instruments. The homeowner receives an official Technical Handover Report detailing the as-built circuit layout and breaker map. For urgent electrical loss, our emergency electrician dispatch fleet operates 24/7.
The band below is the published 2026 list. It is an estimate. The binding figure is written on site after measurement, and the work starts after that.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
In a standard 2-bedroom or 3-bedroom flat with intact conduits, rewiring takes 1 to 2 days; full projects requiring masonry wall chasing take approximately 3 to 4 working days.
Our progressive room isolation protocol establishes temporary power boards for the refrigerator, Wi-Fi router, and lighting, allowing families to reside safely without total blackout.
LSZH Halogen-Free cables do not propagate fire, emit zero toxic acid gases, and produce minimal smoke, ensuring occupants can safely evacuate during structural fire emergencies.
Ovens, dishwashers, cooktops, and kettles combine to draw over 30 Amps. Sharing runs melts wiring; dedicated C16 circuits eliminate all thermal fire risks.
Yes. Solid copper ground rods are driven into building soil, bonded to main panels, and continuous 2.5mm² green-yellow protective earth lines routed to every socket.
Yes. Turnkey rewiring replaces old fuse boards with fire-rated modular enclosures, Schneider/Siemens MCBs, and certified 30 mA Type A life-safety RCDs.
Apartment square meter area, total count of socket and lighting circuits, condition of in-wall conduits, and appliance electrical loads define the fixed labor quote.
Insulation resistance (Megger), earth loop impedance, and RCD trip timing are verified with Fluke instruments; clients receive an official signed handover report.
All turnkey rewiring projects, distribution board installations, and circuit terminations performed by ElektrikçiGO certified technicians carry our official 1 Year Workmanship Guarantee.
You can schedule a survey 24/7 by filling out our fast online form or calling our direct phone and WhatsApp dispatch lines.
Spring-clamp Wago 221 connectors maintain dynamic clamping force regardless of thermal cycles, permanently eliminating screw loosening and resistance-heating micro-arcs.
Conduits route 3x2.5mm² mains lines and Cat6 data cables beneath raised flooring, terminating inside IP44 moisture-sealed modular floor receptacles.
Dedicated neutral runs are routed to every switch backbox, and distribution panels sized with spare DIN-rail capacity to house KNX/Zigbee automation modules effortlessly.
Installations should undergo digital insulation and safety testing every 5 years; wiring in properties exceeding 25 to 30 years must be completely rewired for life safety.
In drywall cavities and timber partition passages, steel conduits shield cabling from mechanical screws and rodent attacks, permanently preventing in-wall spark fires.
Total concurrent household demand is calculated, routing seamless 3x6mm² single-phase or 5x10mm² three-phase armored NYY lines from the meter to eliminate voltage sag.
Old hand-twisted tape splices oxidize over time, loosening and sparking hidden junction fires; spring-loaded Wago lever connectors guarantee zero contact resistance and lifetime safety.
Under national and international electrical safety codes, lighting radial and switch leg circuits must utilize minimum 3x1.5mm² solid copper conductors protected by dedicated B10 MCBs.