
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
Sancaktepe 24/7 emergency electrician. We respond without a minute promise to midnight breaker tripping, residual current device faults, burnt sockets and consumer unit failures. Certified technicians across Sarıgazi, Samandıra, Yenidoğan, Abdurrahmangazi, Meclis, Veysel Karani, Eyüp Sultan, Osmangazi, Paşaköy and Hilal, faults proven by True-RMS measurement, written price approval and an official 1 year workmanship guarantee.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
In Sarıgazi and Samandıra extra storeys were added to existing buildings over the years, with the new flats wired straight into the old undersized service head at ground level. When the floors' neutral returns are pressed onto the same terminal, one flat's load flows through another flat's neutral. As a result a neighbour starting a washing machine trips a different flat's breaker, and voltage appears between neutral and earth.
The repair measures the load currents inside the service head with a True-RMS clamp meter, separates each floor's neutral onto an independent busbar and renews melted terminals with fire-rated ceramic blocks. Every flat is given its own 30 mA Type A residual current device. Where the riser cross-section is insufficient for present demand, a written renewal proposal backed by the measurement report is submitted to the management.
In the older housing stock of Yenidoğan and Abdurrahmangazi a ceramic screw-in fuse board still sits in the hall cupboard. These boards contain no residual current device at all, so protection against electric shock is zero. The fuse melts and welds into its base under overload, fails to clear a short circuit and the board body carbonises over time. The sockets usually have no protective earth either.
The old board is removed entirely and a flame-retardant modular DIN-rail enclosure installed. Each room receives an independent Type C breaker, the kitchen and bathroom get dedicated circuits, and a 30 mA Type A residual current device plus a Type 2 surge arrester are fitted at the incoming side. Where no earth exists a solid copper electrode is driven, its resistance measured and the bootleg jumpers in the sockets removed one by one.

In the crowded family flats of Meclis, Veysel Karani and Osmangazi, kitchen renovations leave a built-in oven, microwave and dishwasher all fed from a single old 2.5 mm² branch. When they run together at dinner time, crackling comes from the socket back-box behind the counter and a sharp plastic odour spreads. That odour is a definite sign the outlet has begun to melt and the socket must be taken out of service immediately.
The blackened conductor ends are cut back, the back-box replaced and an unbroken TSE-certified solid copper 3x2.5 mm² cable pulled from the board to the counter behind the skirting. A separate C16 breaker is fitted for the oven and another for the dishwasher. Daisy-chained extension blocks are removed entirely and enough fixed outlets installed on the wall so load no longer piles onto one point.
Across Sancaktepe the most common night call is a residual current device that trips again the instant it is reset. The technician disconnects every branch at the board and resets the device; if it holds, the fault lies in the installation. Branches are then energised one at a time until the offending leg is identified. This method avoids blind part swapping and pinpoints the faulty circuit in about twenty minutes.
The faulty leg is measured with a megohmmeter to separate leakage caused by damp, by charred insulation or by a defective appliance. If an appliance is to blame it is disconnected and the home re-energised; if the wiring is at fault that leg is isolated and the refrigerator, boiler and lighting restored within the first ten minutes. No drill is used at night in terraced blocks; location is done silently with a cable tracer.

At the end of every job the circuit is measured with a 500 V megohmmeter; if phase-to-earth insulation resistance falls below 1 Megaohm the cable is pulled anew rather than patched. Earth loop impedance is measured at socket outlets to prove the protective device clears a fault inside TS IEC 60364 disconnection limits. During testing phase, neutral and earth are read separately, and any voltage between neutral and earth triggers a search for a bootleg ground jumper.
Earth electrode resistance is measured with a digital earth tester; when the 2 Ohm target is missed an additional rod is driven or bentonite backfill applied. Every recorded value is written numerically onto the service report, handed to the customer and kept on file, so readings can be compared at the next inspection.
If a sharp Bakelite odour or smoke comes from the board and it is not yet in flames, trip the main switch using a dry wooden handle. Never pour water onto switchgear or a burning cable; water conducts, intensifies the arc flash and electrocutes the person intervening. Use only a Class ABC dry chemical powder or carbon dioxide extinguisher.
Never grab an electrocuted person bare-handed; the current passes into the rescuer too and leaves two people across the circuit. Separate the casualty from the source with a dry broom handle, a leather belt or a wooden chair, call the emergency ambulance number, then alert our 24/7 emergency electrician line. Even if the casualty is conscious and says they feel fine they must still attend hospital, because current that has crossed the torso can produce a cardiac rhythm disturbance hours later. Once power is off the board cover is closed and nobody attempts to reset the lever until the electrician arrives.

In an added-storey building in Sarıgazi, the breaker in the upper flat was reported to trip the moment the downstairs neighbour started a washing machine. Arriving in thirty-one minutes, our crew measured 26 volts between neutral and earth at the flat intake, a definite indicator of a shared neutral. Opening the meter panel revealed the neutral returns of three floors pressed onto the same terminal, blackened by overcurrent. Each floor's neutral was separated onto its own busbar, the blackened terminals renewed with fire-rated ceramic modular blocks and all connections torqued to 3 Nm. The flat board received its own 30 mA Type A residual current device; the final reading was 0.4 volts between neutral and earth and the neighbour's load no longer affected the other flat.
At the end of the callout line insulation resistance was re-measured with a megohmmeter, the values entered on the technical service report and a copy left with the customer. Fitted components carry both the manufacturer warranty and our 1 year labour guarantee.
With dispatch coordinated from our Pendik hub and GPS-tracked vans patrolling the main Sancaktepe corridors, average arrival is no fixed minutes. When the technician departs, their name, vehicle plate and a live tracking link are sent by SMS or WhatsApp.
This pattern usually arises from a shared neutral or meter mix-up in buildings with added storeys. When the floors' neutral returns are pressed onto the same terminal, one flat's load flows through another's neutral. For diagnosis the voltage between neutral and earth is measured at the flat intake; anything above a few volts indicates a shared neutral. The fix is separating each floor's neutral onto an independent busbar, renewing blackened terminals and giving the flat its own residual current device.
Yes, it is essential. A ceramic fuse board contains no residual current device, so there is no protection at all against electric shock. The fuse can weld into its base under overload and will not clear a short circuit. The board is removed entirely and replaced with a flame-retardant modular DIN-rail enclosure; each room gets its own breaker, the kitchen and bathroom dedicated circuits, and a 30 mA Type A device plus a Type 2 arrester are fitted at the intake. Where no earth exists an electrode is driven and its resistance measured and documented.
Every part replacement, circuit run and board overhaul carries our official 1 year workmanship guarantee. We install only TSE and VDE certified Schneider, Siemens, ABB, Legrand, Wago and HES Kablo products; copper-clad aluminium cable and uncertified breakers are never fitted.
Every mobile unit is a travelling electrical workshop: Type B and C breakers, 30 mA and 300 mA residual current devices, Type 2 surge arresters, Wago terminal ranges, NYM, NYA and NYY cable drums plus IP54 and IP65 socket mechanisms are carried on board. Thanks to that stock the fault is usually cleared permanently on the same visit.
Yes. Sancaktepe is covered on Saturday, Sunday, public holidays and at night. On the Anatolian side the on-call run starts from Pendik. Arrival depends on traffic and the queue; no minute is promised. A night or holiday difference is stated on the phone before anyone sets off.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Sancaktepe call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Sarıgazi
Shared neutral separation and busbar renewal
Samandıra
Added-storey service head terminals
Yenidoğan
Fuse board to modular board
Meclis
Counter socket meltdown repair
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
19 / 19 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google