November 2026 updated price and service guide

Districts

Şişli

5.0 / 5.0 on Google · 2 verified reviews
  • On-call from Pendik · European side by appointment · no minute promise
  • State-Certified Mastery Qualification · Invoiced With A 1 Year Guarantee
  • No Surprise Charges · Clear Price Approval Before Work
  • TSE & ISO referenced materials · Scan slots on the certificates page

A call for an electrician in Şişli often starts with a neutral bar heating while the phase breaker has not opened. The old apartment column of a high-ceiling Nişantaşı block and an office floor in Mecidiyeköy can stand side by side in the same shaft. Computer power supplies, LED drivers and uninterruptible supplies in the office gather the third harmonic on the neutral. A True-RMS clamp can read a neutral current higher than the phase current. An averaging clamp shows that current as small, and the fault is then written onto a socket cover. The building is not a factory. A production line, an industrial busbar or a bank of heavy motors does not enter this note. The job is the split, after the meter, between the office floor and the dwelling floor. If office load has been parked on the old dwelling column, the neutral heats, the lamp flares and then fades, and the phase breaker stays put. The sealed meter belongs to BEDAŞ. We do not open the seal. A Şişli record has no arrival minute. A burning smell or a shock is placed at the head of the same day. Traffic coming down from the bridge toward Mecidiyeköy is not turned into a minute promise.

  • Appointment, no minute promise
  • 25 Neighborhoods
  • 30 Services
Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet
Adnan Şemiye
Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet

Founding master

Adnan Şemiye18 years in the field

MYK-certified master

Adnan Şemiye reads this job in the field. The price is written before work starts.

From the field

ElektrikçiGO emergency electrician van, Istanbul 24/7Emergency van · ⁦+90 582 403 10 87⁩

The Nişantaşı apartment and the Mecidiyeköy office neutral

A heated neutral bar and a row of DIN breakers on a Nişantaşı flat board

The old apartment column and the ground-floor window

In Nişantaşı and Teşvikiye the ceilings are high and the drop from the rose to the board is long. Flats of the 1950s and 1960s still have two-wire NYA sockets and a thin lighting pair. An earth may never have been pulled. The ground floor is a boutique or a shop with a window, not a night bar. Track spots and window transformers were added later onto the dwelling column. When the window lights in the evening, the neutral screw of the flat above heats. The heat may not open the phase breaker, because the load is on the neutral. Even when the call arrives as a burnt socket, the first place looked at is not the cover but the neutral bar at the flat intake. Which screw of the bar goes to which floor is written down. A loose screw is tightened and a blackened NYA tail is cut back to sound copper. The tightening does not crush the conductor. The load is read with a True-RMS clamp, once with the window on and once with it off. If the phase current is ordinary and the neutral current is high, the fault is the residual the window transformer has parked on the neutral. The ampere rating is not raised. A 1.5 mm² lighting pair does not go above 16 amperes. The window leaves the dwelling socket on the board after the meter.

If a washer chassis shocks in an old flat, the cause is a missing earth, not the heat of the neutral. A two-wire socket has no protective conductor. If the chassis was bonded to a heating pipe, the pipe is not accepted as an earth. The plug comes out. If there is no 30 mA Type A residual-current device, the board is written ahead of a window bulb. The device is not bridged. If electronic residual from the office floor and the cloth or tired NYA insulation of the dwelling gather on the same device, the device drops at night. The lines are separated with a 500 V megohmmeter. The computer, the television and the window transformer come off their plugs before the test so the test voltage does not reach a board. A dwelling branch under one megaohm is not landed on a new breaker until it is renewed. If a cloth conductor crumbles in the fingers, that room goes into halogen-free trunking along the architrave, and the high ceiling is not chased. Plaster and cornice are not broken for the trunk. Joints inside the trunk stay in boxes. A Schneider or Siemens DIN breaker is chosen with a breaking capacity matched to the board. The cooker, the washer and the air conditioner are not left on the same 16 ampere way.

Harmonics and neutral current on an office load

On a Mecidiyeköy office floor there are many switch-mode supplies on the same phases. The third harmonic and its multiples add together on the neutral. The phases can look balanced while the neutral carries more current than one phase. This is not a factory busbar. A desktop computer, a screen, an LED driver and a small uninterruptible supply are the load of an office floor. The measurement is made on the neutral conductor, under load, with a True-RMS clamp. The clamp must close fully around the neutral and must not miss half of it. If the neutral current is above the phase current, the neutral bar and the section of the neutral conductor are written down. If the section is short, the office neutral after the meter is enlarged, or the office neutral is separated from the dwelling neutral. The service neutral ahead of the sealed meter is not ours to enlarge. If that side is hot, the report goes to BEDAŞ. The rating of the phase breaker is not raised to cool a hot neutral. Raising it leaves the thin neutral with still more residual. Phase-to-neutral voltage is written on the same paper. If the voltage is ordinary and the neutral current is high, the fault is separate from a loose neutral. If the two are mixed, the wrong screw is tightened in the name of a flaring lamp.

On the office floor a 30 mA Type A device stays in place for the pulsed leakage of switch-mode supplies. The threshold is not raised. If the small leakages of a floor full of supplies add up and drop the device, the lines are split into groups and each group is written to its own device. A bridge leaves the office socket without protection. Changing the device without grouping brings the same trip back the next morning. A 500 V megohmmeter reads branch insulation after the supplies are unplugged. Low insulation is not waved through as harmonics. The two are separate lines. If a screw on the neutral bar is loose, it heats even without harmonics. The screw is tightened and the current is read again. If the current is still high, the cause is section and harmonics, not looseness. The chassis leakage of an uninterruptible supply is also separated with the clamp, not along a chassis wire, but on the supply neutral and phase of the unit. If the chassis shocks, the plug comes out and the earth conductor is completed in halogen-free trunking. The office earth is not left on a heating pipe. A heavy industrial motor is not looked for on this floor and it is not written down.

The dwelling column, the commercial riser and Cat6

Adnan Şemiye, ElektrikçiGO electrician, Istanbul building meter cabinet

Why two risers in the same shaft get mixed

When an office floor opens beside or under a Nişantaşı apartment, a commercial riser may have been pulled next to the old dwelling column. The two can look like one shaft and they may have been landed on the same neutral bar. The office harmonic current then heats the dwelling neutral. The lamp upstairs settles when the office day ends and flares again in the morning. The caller blames the flat socket. The split is made on the board after the meter. The office phases and the office neutral go onto their own bar. The dwelling phases stay on their own bar. A neutral bridge is not left between the bars. A label states which conductor goes to the office and which goes to the flat. If there is no label, two readings are taken with the clamp, once while the office floor is under load and once with the load off. The conductor whose neutral current falls when the load falls is the office. The conductor that does not fall is the dwelling. This split does not open the cover of the sealed meter. If the common service cable ahead of the meter is hot, the line goes to BEDAŞ and to the manager together. The manager's note has the floor, the phase and the neutral amperes. The note is not written as a factory survey. The place written down is an office floor and a dwelling floor.

The office Cat6 is not clamped to the power riser. Data that runs beside the power line the length of the corridor both picks up noise and gets joined by mistake to the lighting pair. Cat6 is pulled in its own halogen-free trunk. The trunk does not break the cornice of the dwelling stair. Room and socket numbers are written at the ends. The RJ45 is proved with a cable tester. It is not left because a screen came on. A camera supply is not taken from the lighting pair. The lighting pair in a Nişantaşı corridor is thin NYA and it is switched. The camera adaptor heats that pair. The adaptor is fed from the office or flat board after the meter, on its own fuse. If a short power tail that leaves for an outer court will get wet, NYY is used. NYY is not fitted in place of Cat6. The two cables are not crushed in one grip. If a window on the office floor runs through a dimmer, the dimmer stays on a way apart from the camera and the computer sockets. The dimmer's leakage should not drop the 30 mA Type A device together with the office group. When the job ends, the paper keeps which bar was separated and which Cat6 end passed the test.

The BEDAŞ seal, the appointment and the 2026 labour bands

The 2026 bands are labour excluding materials, and in Şişli they move on site. Fault finding sits in the 750-1,500 TL band. Reading the neutral and the phase apart with True-RMS, and a 500 V megohmmeter test, sit inside that band. A breaker or residual-current device sits in the 1,250-3,200 TL band. A 30 mA Type A device split onto an office group, and a Schneider or Siemens DIN breaker, enter that band. A socket or a light sits in the 650-2,800 TL band. A single Nişantaşı socket and the separation of a window transformer are not written as one item. An air-conditioning circuit sits in the 2,400-5,500 TL band. An air conditioner is not added later onto an old 16 ampere way. A flat board sits in the 6,500-16,000 TL band. An old apartment board whose neutral bar has carbonised is what that band covers. Separating the office bar from the dwelling bar is not a renewal of a whole estate, and it is not priced as a factory board. The survey fee comes off the job if the repair is accepted. The binding figure is written after measurement and before work starts. Workmanship is guaranteed for one year. NYA, NYY, halogen-free trunking and Cat6 sit outside as materials. The service neutral at the sealed meter does not enter these bands.

A Şişli call is written in the appointment book. A burning smell, arcing or a shock is placed at the head of the same day. If there is no smell and no shock, the neutral measurement stays on the appointment day that was named. Traffic coming down from the bridge toward Mecidiyeköy is not written in this book as a minute figure. The technician states any tariff difference on the phone before setting off. The book records whether the address is a Nişantaşı apartment or a Mecidiyeköy office, whether the meter seal is in place, whether the neutral is hotter than the phase, and whether the device is bridged. An industrial board change is not promised on missing information. When the job ends, the paper keeps the neutral amperes, the phase amperes, which bar was separated, and the test button of the device. The one-year workmanship guarantee belongs to that job. The term does not grow because of a wait on the bridge. If the bell transformer is hot, the bell circuit leaves the socket circuit. A camera is not piled onto the entry-phone pair. A survey item is not opened as if the office floor had a production line. If the meter cover is warm and the seal is intact, the company is called, and the flat or office board stays on its own line the same day.

Frequently asked

Frequently asked

Why does the phase breaker stay closed while the neutral heats in Şişli?

The third harmonic on the office floor gathers on the neutral. The phases look balanced and the neutral current comes out higher than the phase. A True-RMS clamp closes fully around the neutral. An averaging clamp shows the current as small. The phase breaker rating is not raised. If the section is short, the office neutral after the meter is separated or enlarged. If the service neutral is ahead of the seal, it is a BEDAŞ report. This building is not written down as a factory.

Is a Nişantaşı window tied to the flat column?

If it is tied, it is separated. When track spots and a window transformer sit on the old NYA column of a high-ceiling flat, the neutral screw heats. Readings with the window on and off are written apart. The split is on the board after the meter. A 1.5 mm² lighting pair does not go above 16 amperes. The seal is not opened.

Is Cat6 pulled with the power line in a Mecidiyeköy office?

No. Cat6 is in its own halogen-free trunk and is not clamped to the power riser. The ends are proved with a cable tester. A camera is not fed from the lighting pair. A wet court tail goes in NYY if it must. NYY is not put in place of the data cable. An end left because a screen came on is not a finished job.

Who opens the meter seal in Şişli?

We do not open it. The sealed meter and the part of the service neutral ahead of the meter are a BEDAŞ report. The neutral bar after the meter, the split between office and dwelling, the sockets and the flat board are our measurement. If the cover is warm and the seal is intact, the company is called. Board work is not mixed into the seal work.

How is the Şişli electrician labour band for 2026 written?

The band is labour, excluding materials. Finding a fault is 750-1,500 TL, a breaker or device 1,250-3,200 TL, a socket or light 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL. The binding figure is written after measurement. Workmanship is guaranteed for one year. There is no promised minute. An office floor is not priced apart as a factory board. Bridge traffic does not change the band.

How is a night or Sunday call planned in Şişli?

Şişli on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

Services

PLC programmingindustrial electrical serviceShort circuithome–plant electrical serviceSocket and switchhome electrical serviceResidual-current devicehome electrical serviceEarthinghome–plant electrical serviceCable and circuit runhome electrical serviceRewiringhome electrical serviceTelevision mountingelectrical fitting serviceAC Electrical Wiringresidential–commercial AC serviceIntercom & Doorbell Systemsresidential intercom serviceFuse & Panel Faultsconsumer unit & panel serviceChandelier Mounting & Lightingresidential lighting serviceInternet & Data Cablingresidential & office network serviceElectrical Fault Repair24/7 emergency fault serviceDistribution Board Setupresidential–commercial panel serviceEarthing & Lightning Protectionbuilding earthing & surge serviceSecurity Camera Systemssurveillance & CCTV serviceEV Charger InstallationEV charging infrastructure serviceSmart Home Automationsmart home & KNX/Zigbee serviceHalf The House Has No Powerpartial outage & phase loss repairBurning Smell and Crackling Socketsemergency thermal inspection & arc repairVoltage Fluctuation, Regulators and UPSvoltage protection & uninterruptible powerGenerator and ATS Paneltransfer panelMeter, Main Switch and Risercustomer side after the meterLift and Hydrophore Panelpanel supplySolar Inverter Board Connectioncustomer-side AC outputPanel faultLighting installationBreaker replacementSecurity camera

What Can You See At Home? Fast Diagnosis By Symptom

There is a burning smell from a socket

Single socket being checked for burn marks

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The breaker keeps tripping

Main switch and breaker row

Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The flat has lost power

Meter measuring voltage

If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The breaker trips when the AC or oven starts

Breaker dedicated to an appliance circuit

Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

A chandelier needs fitting

Chandelier on the ceiling

The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

I get a shock from the sink or washing machine

Washing machine socket connection

There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

How Our Field Team Works A Call

On Şişli call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.

  1. 01
    Symptom
    The residual current device trips again the instant it is reset
    Measurement
    Branches are separated one by one at the board and each leg measured with a 500 V megohmmeter. Insulation resistance below 1 Megaohm shows that run's insulation is no longer doing its job.
    Intervention
    The faulty leg is isolated and the refrigerator, boiler and lighting restored within the first ten minutes. If damp is the cause the junction box is dried and encapsulated in dielectric gel; if the insulation is charred the run is renewed back to the board.
  2. 02
    Symptom
    A burning smell from a socket with a deformed face plate
    Measurement
    A FLIR thermal sweep is taken under load; where a loose screw connection has carbonised the terminal, that point reads between 160 and 200 degrees and is found without opening the wall.
    Intervention
    Blackened conductor ends are cut back to clean copper, the back-box replaced and the joint closed with a Wago 221 lever terminal. Every screw connection is tightened with a calibrated screwdriver to between 2.5 and 3.5 Nm.
  3. 03
    Symptom
    Half the flat has no power while the other half works
    Measurement
    Voltage is read phase by phase downstream of the meter. On neutral loss one phase measures above 250 volts and another around 180; that pattern burns appliance boards the same night.
    Intervention
    The main neutral terminals are opened, oxidised surfaces cleaned with dielectric solvent and torqued to specification. An over/undervoltage protection relay is added so appliances survive the next neutral loss.

2026 Electrician Prices and Recently Completed Jobs

The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.

2026 Electrician Prices and Recently Completed Jobs
JobTypical price rangeWhat is included
Fault diagnosis and measured survey750 TRY – 1,500 TRYDiagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted.
Breaker / RCD replacement1,250 TRY – 3,200 TRYA 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified.
Dedicated air conditioning circuit2,400 TRY – 5,500 TRY3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route.
Flat board renewal (modular DIN)6,500 TRY – 16,000 TRYVaries with room count, circuit splitting and whether a surge arrester is included.
Chandelier, spot and socket installation650 TRY – 2,800 TRYPriced per unit; heavy chandeliers include a steel anchor set into structural concrete.
Internet and Cat6 data cabling1,100 TRY – 4,200 TRYIncludes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester.
Factory / power factor periodic maintenance4,500 TRY – 18,000 TRYBy panel and step count; includes a thermal sweep and a written measurement report.

Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.

A Free Five-Point Board Safety Check On Every Call-Out

Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.

01

All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.

02

The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.

03

Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.

04

Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.

05

Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.

Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.

Services We Provide In This Area

Neighborhoods

Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.

Show neighborhoods

Google Review

Happy With The Work? Leave Us 5★ On Google

Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.

Current rating: 5.0 / 5.0 · 2 verified reviews

Leave 5★ On Google
QR code opening the ElektrikçiGO Google review page
Scan with your phone after the job