
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
Ataşehir 24/7 emergency electrician. We respond without a minute promise to midnight breaker tripping, residual current device faults, burnt sockets and consumer unit failures. Certified technicians across Barbaros, Küçükbakkalköy, İçerenköy, Örnek, Esatpaşa, Ferhatpaşa, Yenisahra, Mustafa Kemal, Kayışdağı and Aşık Veysel, faults proven by True-RMS measurement, written price approval and an official 1 year workmanship guarantee.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
In the office towers of Barbaros and Mustafa Kemal Mahallesi, the server room and UPS boards are sensitive loads. Large numbers of switch-mode power supplies generate third and ninth order harmonics, which circulate a neutral current exceeding the phase current. Where the neutral is left the same size as the phases the conductor overheats and more than three volts is measured between neutral and earth.
Our crew measures total harmonic distortion with a harmonic analyser, doubles the neutral cross-section relative to the phases and recommends a harmonic filter where required. A dedicated earth busbar is run to the rack circuits, the UPS bypass switch tested, and a Type 1+2 surge arrester fitted in the board to protect against utility switching.
Smart switches and relay modules have become widespread in the newer flats of Küçükbakkalköy and İçerenköy. In older Turkish wiring only the live and the lamp return were pulled to the switch box, with no neutral. When a neutral-requiring smart switch is fitted into such a box, LED lamps glow faintly or flicker while switched off because of ghost current.
The correct solution is pulling a neutral conductor to the switch box from the nearest junction box; a bypass capacitor is a temporary patch and does not resolve dimmer incompatibility. Alternatively the relay module is placed at the luminaire end. All smart modules are used with their original drivers and a Type 2 arrester added to the lighting circuit.

Demand for electric vehicle charging in the covered car parks of Ferhatpaşa and Esatpaşa complexes is rising quickly. A charger draws full load continuously for hours and can never be connected to the existing car park lighting circuit. Installation with inadequate cross-section and protection causes persistent cable heating and voltage drop on the building riser.
Before installation the existing load at the building main device is measured and the remaining capacity calculated. The charger gets a dedicated NYY cable from the board, 4 or 6 mm² according to charge power, a C32 or C40 breaker and a 30 mA Type B residual current device capable of detecting DC components. Earth resistance is measured and documented.
In the residence-to-office conversions of Yenisahra and Örnek, numerous computers, printers, water boilers and servers have been added on top of wiring designed for domestic use. Daisy-chained extension blocks under desks saturate a single circuit, socket boxes heat up and the residual current device trips randomly through the day. Enlarging the fuse here leaves the cable unprotected and increases fire risk.
After measurement the installation is re-divided for office use: workstation sockets, the kitchen and boiler group, and the server and network equipment each get their own circuit and their own residual current device. Daisy-chained extension blocks are removed and enough fixed outlets installed on the wall or in trunking.

In the mixed-use towers of Ataşehir, night work is subject to building management permission and quiet-hours rules. Our technician first confirms the floor plan and riser route with the building's technical officer, then locates the fault using board measurements and a cable tracer without any drilling. Lift, fire detection and generator circuits are never isolated without notice under any circumstances.
Once the faulty leg is isolated, critical loads such as servers, security cameras and lighting are restored first. Noisy chasing and breaking work is scheduled for the daytime slot set by the building management, and every action taken is recorded with its measured values on a written service form.
In the garden complexes of Kayışdağı and Aşık Veysel, pathway luminaires and garden sockets are fed underground. Over the years the cable sheath is damaged by root pressure or a spade strike; after rain the soil moisture raises leakage current and the entire exterior lighting device trips. Residents are left walking dark paths at night with a real risk of falls.
The leakage point is located to within a metre using a cable fault locator and insulation testing, so the whole route need not be excavated. The damaged section is repaired with a resin-filled underground joint box, or that run renewed in underground grade NYY cable. The exterior lighting circuit is given its own 30 mA device and luminaires replaced with IP65 rated fittings.

Our service vans stock only TSE and VDE certified Schneider Acti9, Siemens 5SY, ABB and Legrand miniature breakers. Copper-clad aluminium conductors carry roughly sixty percent higher resistance than solid copper and glow red inside the conduit under oven, water heater or air-conditioning loads, so they are never installed. Cross-sections are calculated from appliance nameplate power, run length and permitted voltage drop. Oven and hob circuits start at 3x4 mm², air-conditioning and water heater circuits at 3x2.5 mm², stepping up one size as the run lengthens.
Every junction is closed with fire-retardant Wago 221 lever terminals; taped or twisted splices are refused because they loosen over time and generate contact resistance heating. On completion the circuit is measured under dynamic load, the residual current device trip time is verified with a dedicated tester, and a signed service report plus the official 1 year workmanship guarantee is handed over.
Taping the handle of a repeatedly tripping breaker or winding heavy copper wire onto a ceramic fuse completely disables the circuit's thermal and magnetic protection. Overcurrent is no longer interrupted, the conductor glows inside its conduit and an arcing fire starts behind the plaster. A tripping device always signals a genuine overload or insulation fault; the lever never falls on its own.
The correct remedy is finding the fault, not upsizing the device: line current is measured with a True-RMS clamp meter, insulation resistance with a megohmmeter, the overloaded branch is split onto a dedicated circuit and the protective device is rated to match the conductor cross-section. If cross-section and breaker rating do not match, the protection guards the appliance rather than the cable; fitting anything above a C16 on a 1.5 mm² run or above a C20 on 2.5 mm² leaves the cable unprotected. For that reason the existing conductor size is physically measured on every visit and the breaker rating set from that measurement.

A burning odour from the board was reported on an office floor in Barbaros and our crew arrived in twenty-seven minutes. Thermal imaging read the phase conductors at sixty degrees while the neutral measured ninety-four, the classic signature of harmonic loading. Harmonic analysis showed third order content at thirty-one percent and a neutral current one and a half times that of the most loaded phase. The neutral was upgraded to twice the phase cross-section, melted neutral terminals renewed, a dedicated earth busbar run to the rack circuits and a Type 1+2 surge arrester fitted in the board. The closing thermal sweep showed the neutral down to forty-eight degrees.
The brand and model of switchgear fitted, all measured values and the labour charge were written onto a signed service report and handed to the customer. Parts and labour are covered by the official 1 year guarantee.
At a Ferhatpaşa complex, the cable of an electric vehicle charger installed in the covered car park was reported too hot to hold during charging. Arriving in twenty-six minutes, our crew found the unit fed from the car park lighting circuit in 2.5 mm² cable and measured the cable at seventy-two degrees while drawing thirty-two amperes. Protection consisted only of a Type AC device, which cannot detect the charger's DC component. The lighting-circuit connection was removed entirely, an unbroken 5x6 mm² NYY cable pulled from the main board to the car park, and a C40 breaker with a 30 mA Type B residual current device installed. Earth resistance was measured at 1.8 Ohm and reported.
After completion the residual current device trip time was measured with an external tester, the board swept thermally, and the system handed over running under dynamic load in front of the customer.
With dispatch coordinated from our Pendik hub and GPS-tracked vans patrolling the main Ataşehir corridors, average arrival is no fixed minutes. When the technician departs, their name, vehicle plate and a live tracking link are sent by SMS or WhatsApp.
The most common cause is harmonic loading. Many switch-mode power supplies generate third and ninth order harmonics whose current accumulates in the neutral, which can exceed the most loaded phase. Thermal imaging showing normal phases but a much hotter neutral confirms it. The fix is doubling the neutral cross-section relative to the phases, adding a harmonic filter if required and running a dedicated earth busbar to the rack circuits.
Because there is no neutral conductor in the switch box. The smart switch passes a small current through the lamp to power itself, and the LED driver glows faintly on that ghost current. The lasting fix is pulling a neutral to the switch box from the nearest junction box. A bypass capacitor is a temporary patch that does not resolve dimmer incompatibility; alternatively the relay module is placed at the luminaire end.
Yes, but first the existing load at the building main device is measured and the remaining capacity calculated. A charger is never connected to a lighting circuit; a dedicated NYY cable is pulled from the board with 4 or 6 mm² according to charge power, a C32 or C40 breaker and a 30 mA Type B residual current device able to detect DC components. Earth resistance is measured, reported and the installation documented to the management.
During standard daytime hours digital fault diagnosis and measurement labour averages 500 to 800 TL. For on-call jobs between 20:00 and 08:00 an approximate forty percent night surcharge covers standby crew and vehicle costs; that surcharge is confirmed clearly on the phone before the van departs and is never altered afterwards.
Yes. On arrival the fault is proven by measurement, then the brand and model price of each replacement part plus the net labour total are presented separately in writing. Not a single screw is turned without approval and no surprise line items appear at the end.
Yes. Ataşehir is covered on Saturday, Sunday, public holidays and at night. On the Anatolian side the on-call run starts from Pendik. Arrival depends on traffic and the queue; no minute is promised. A night or holiday difference is stated on the phone before anyone sets off.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Ataşehir call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Barbaros
Server room neutral upsizing
Küçükbakkalköy
Neutral pull for smart switches
Ferhatpaşa
EV charger circuit and Type B device
İçerenköy
Office socket group circuit split
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
17 / 17 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google