
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
An electrician call in Güngören comes through two doors. One is a small workshop on the Merter edge: an overlock, a steam-iron table, or a cutting knife has stopped. When the bench stops, the cloth stays on the table, the queue behind it swells, and every stopped minute is the shop's own loss. The other door is the dwelling one street behind the workshop. In Tozkoparan, Haznedar, Güneştepe, Gençosman, Akıncılar and Merkez a socket cover has burnt and the iron was left on the same circuit. The district is small and the street is tight. A factory that carries a brand name is not on this page. The parts read on the bench are the starter, the contactor and the overload relay. If the fault is beside the motor, the mechanical coupling is looked at on the same visit: the spider rubber, the pulley screw, a seized bearing. The machine is not rebuilt and the gearbox is not stripped. The meter seal belongs to BEDAŞ and it stays. No minute is quoted for Güngören, and no night-arrival notice is given. The call is written as an appointment. A burning smell or a shock is moved to the front of the same day. Labour is written after measurement, and the guarantee is one year.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
In Tozkoparan and Haznedar a home socket carries an iron brought in from the workshop. The iron is around 2000 watts, and when the steam boiler is added to the same multi-plug the circuit sits near a continuous 16 amperes. A tired 2.5 mm² NYA tail loosens, the screw heats, the cover turns brown, and the box smells of carbon. The caller changes the cover and the carbon stays inside. The circuit is made dead, the carbonised tail is cut back, and the section of the remaining copper is written down. If the section is 2.5 mm² and the insulation is sound, the way is tightened again and the iron and the boiler are split onto separate sockets. If the insulation dusts, that wall is pulled in new NYM inside halogen-free trunking. If the lighting is 1.5 mm² the iron is not taken onto it, and the 10 amp breaker is not enlarged. In Güneştepe the same tail is found hot in the morning because the iron was left on at night. A hot cover is written to the front of the same day. The queue is not an announced minute.
In Gençosman and Akıncılar the device drops on leakage from the iron boiler's body. If, as in the photograph, three breakers and a 30 mA device stand on the rail, the device is not bridged. A bridge leaves the body open on a wet ironing table. If the test button does not drop, the device is changed and the circuits are separated with a megohmmeter. 500 V is not applied until the electronics and the iron plug are disconnected. A way under one megaohm is not connected behind the new device. A sound way is put back and the test button is dropped again. If there is a shock, the iron plug comes out and the body is not jumpered to a water pipe. A pipe is not an earth. In Merkez, if the light way and the socket way are mixed on the same board, the iron is not moved onto the lighting. The 2026 dwelling labour band excludes materials: fault finding 750-1,500 TL, a breaker or residual-current device 1,250-3,200 TL, a socket or light fitting 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL. The figure is written after measurement. Workmanship is one year.
On the Merter edge some homes run a workshop plug through the window into a flat socket. That extension spoils both the dwelling breaker and the workshop leakage reading. The extension comes out. The flat board stays on its own device after the meter. The workshop feed drops on a separate way after the meter, not ahead of the seal. If the riser section does not carry these two loads, a written note is left with the manager: floor, phase, clamp amperes. We do not open the seal. If the meter body is hot, the report goes to BEDAŞ and the burnt socket is written separately the same day. On the tight stair toward Abdurrahman Nafiz Gürman the riser screw sees the irons of more than one flat. The screw is not limited to the flat cover. The reading is repeated with the irons off and with one of them on. If the difference grows, the neutral has loosened and the cover is not blamed.
Adding an air conditioner to a burnt socket is treated as a forbidden job. A separate circuit is required, the labour sits in the 2,400-5,500 TL band, and the figure does not bind before the section is measured. Changing a light fitting or a socket sits in the 650-2,800 TL band, and a cover alone is not fitted while carbon remains. If the board is to be renewed, the 6,500-16,000 TL band is written after the old bridges on the rail are removed. A Güngören call is in the appointment book. A burning smell or a shock is moved forward the same day. A minute figure is not quoted for a narrow street in a small district. Before setting off, the technician separates on the phone whether it is home work or workshop work, and which band it sits in. One year of workmanship sits on the written section and the device-test row.

When a machine goes quiet in a small workshop on the Merter edge, the owner counts every minute. That minute is the shop's wage, not our arrival promise. It is written to an appointment time. If a burning smell comes from the contactor box, or the body shocks, it is moved forward the same day. In the box there is a starter: an isolator, a contactor, an overload relay. The coil voltage is read, 230 volts on most benches. If it buzzes while pulled in and the magnet face is oily, the coil and the face are dealt with before a contact welds. If the contact pit has deepened, the contactor is changed, and it is not called 'good enough' with sandpaper. The overload relay is brought to the current on the motor plate. Class 10 is written for a short start on an overlock, class 20 for a heavy cutting pulley. The relay is not jumpered with wire. Under the sewing load the clamp writes the three phases, or the line current on a single-phase motor. If the current is near the plate and balanced, the electrical side is holding.
If the current is high, balanced, and the relay is set correctly while the bench is quiet, the fault is often in the coupling. If the spider rubber has broken up, the motor turns, the pulley loses the load, and the needle does not come down. If the rubber has swollen or a bearing has seized, the motor locks on start and the relay does its job and drops. On the same visit the coupling cover is opened and the rubber, the pulley set screw and the shaft alignment are looked at. If there is a bind, the electrical side is cleared and the mechanical link is stated. The motor winding is measured in place, and if the body leaks the plug comes out. The gearbox, the knife mechanism and the cloth setting are not stripped. This is an electrical visit, and the coupling is looked at because it sits at the same point as the motor's electrical fault. If the feed is 1.5 mm², the motor circuit is changed to 2.5 mm² NYM and it is not extended from a home socket through the window. When the work is finished, the paper holds the coil volts, the plate current, the measured current, the relay class and the coupling note. One year of workmanship is on those rows. The band, excluding materials, is the same as the home work and it binds after measurement. The cost of the stopped minute is written to the shop, and a minute is not added to the appointment.
No. Every stopped minute is the shop's own loss. Our paper is an appointment time. If a burning smell comes from the contactor box, or the body shocks, the call is moved to the front of the same day. A minute figure is not quoted for arrival.
Yes, if the current is high and balanced and the relay is at the plate value. On the same visit the spider rubber, the pulley screw and the bearing are looked at. A bind drops the relay correctly. The gearbox and the knife mechanism are not stripped. The note is written on the paper.
A steam iron and a boiler heat a tired socket screw continuously. Changing the cover does not hide the carbon. The tail is cut back and the iron and the boiler go on separate sockets. An iron is not piled onto 1.5 mm² lighting. A hot cover is written forward the same day.
No. The seal belongs to BEDAŞ and it stays. The home board, the burnt socket and the workshop way are after the meter. A workshop plug is not run through the window into a home socket. If the seal is already broken, or the meter is hot, the company is called.
After measurement, excluding materials. Finding a fault is 750-1,500 TL, a device or breaker 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a board 6,500-16,000 TL. The contactor and the overload are written inside the device band. There is no minute. Workmanship is one year.
Güngören on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Güngören call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
11 / 11 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google