
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
An electrician call in Kağıthane describes two levels at once. On the valley floor, Cendere is where an old workshop shell has been turned into an office. The new office riser has been joined, inside a box, to the circuit of a cloth-era flat that still stands beside it. On the hill slope, in Gültepe, Harmantepe, Nurtepe and Ortabayır, the block is old and the box is damp. A valley morning drops the insulation, the residual-current device drops, and someone bridges the device. The bridge leaves the body leakage of a damp box open. In Çağlayan and Hamidiye a new riser and an old flat can share the same landing. The work is after the meter. The seal belongs to BEDAŞ and it stays. No minute is quoted for Kağıthane, no duration is set for the valley congestion, and no night-arrival notice is given. The call is written as an appointment. A burning smell or a shock is moved to the front of the same day. Labour is written after measurement, and the guarantee is one year.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
The Kağıthane valley holds moisture in the morning. The ground-floor box in Cendere and Hamidiye sweats, the insulation drops, and a 30 mA device opens together with the kitchen load. On an office floor the same moisture also drops an adapter that has soaked in a socket box. The caller bridges the device and says it 'does not trip all day'. The bridge does not hold the leakage of a wet box at the threshold. It leaves it on the body. The test button of the device standing on the rail in the photograph is pressed first. If it does not drop, the device is changed and a bridge is not fitted. The circuits are separated. A 500 V megohmmeter is not applied until the computer power supply, the dimmer and the split indoor-unit plug are disconnected. After the electronics are off, each way is read. A circuit that stays under one megaohm does not return behind the device until it is dried and the rotten tail is renewed. The inside of the box is wiped, the damp NYA tail is cut back, and the new tail is NYM. The wall is not broken in strips to chase valley plaster. Halogen-free trunking on the flat's own wall is enough.
In a hill flat the problem is not the mist. It is a box cover that has stayed wet for years. In Gültepe and Harmantepe a single core left from the cloth era drinks moisture inside the plaster. If a cloth-covered tail crumbles in the fingers, that circuit is taken into surface trunking. The plaster is not chased because it is called historic, since here the plaster has already blistered. If there is no earth core, the washer body shocks. A wire thrown onto a water pipe does not count as an earth. A 30 mA Type A device is fitted so it can see body leakage, and it is not removed so the damp will 'finish'. In Nurtepe and Ortabayır one flat on the same stair has a device and the neighbour has none. The flat without a device gets its own, so it does not carry the shared riser's leakage onto the neighbour. The shared riser itself belongs to the building. It is written to the manager on which floor the insulation dropped. The side before the seal is BEDAŞ's line. We do not open the seal.
In Cendere a workshop shell has become an office. The new riser was pulled in NYM, or in NYY on a short run, and tied inside a box to the old flat's neutral bar. When the office socket load and the split air conditioner come on in the evening, the old flat's lamp flares or dies. The caller changes the socket on the hill, and the joint at the valley level stays. The reading is written at two points: the office board intake and the flat intake, with the air conditioner on and off. If phase-to-neutral is steady in the office and moves in the flat, the joint is on the shared neutral. That joint comes apart. The office neutral stays on its own bar and the flat neutral stays on its own bar. The two neutrals may meet after the meter, measured and labelled. They do not meet at random inside a box. If the office riser is three-phase, 400 volts is not brought near the flat through one phase's neutral. A computer circuit is not hung on an old cloth-covered tail. A separate socket, a separate neutral, and the back of the 30 mA Type A device on the board.
A new office board that closes neatly does not repair the carbonised tail of the old flat. In Şirintepe and Talatpaşa the office lighting is found tapped from the 1.5 mm² circuit of the flat on the slope. That circuit is at 10 amperes, and it heats when the office strip and the tea urn are added. The office is taken onto its own 2.5 mm² NYM way. The air conditioner drops on a separate circuit, the labour band is 2,400-5,500 TL, and it is not added to the old tail. The 2026 figures are labour excluding materials: fault finding 750-1,500 TL, a breaker or residual-current device 1,250-3,200 TL, a socket or light fitting 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL. The office board is written in the board band after the section and the neutral split are seen. What binds is the figure after the megohmmeter row is in place. Workmanship is one year. If the device is bridged again, the guarantee ends on that device.

A Kağıthane call is not written in one sentence. What is asked on the phone is whether the address is the valley floor or a hill stair. If the device drops in the morning in a Cendere office, damp and a shared neutral are taken first. If a cover is hot in Gültepe, a carbonised tail is taken first. If both are wanted the same day, two appointment rows are opened, because the box is one job and the board is another. If there is a burning smell or a shock, the row is pulled to the front of the same day. Outside that, no duration is set. A minute figure is not put on the congestion of the valley road. Before setting off, the technician separates the band: finding a fault 750-1,500 TL, a device or breaker 1,250-3,200 TL, a socket 650-2,800 TL. The board and the air conditioner sit in their own bands only after the section is seen. Materials do not enter these figures.
On site the order is fixed. Power is cut, the bridge comes off if there is one, and a neutral joint is not left unlabelled. The megohmmeter is written once the electronics are disconnected. If the office riser returns to the flat box, the joint is opened and each neutral drops to its own bar. If a cloth-covered tail has crumbled in the hill flat, trunking is pulled and the 1.5 mm² lighting stays at 10 amperes. If there is a shock, the plug comes out and the pipe bridge comes off. If the street and the next building are dark and the meter is cold, the report is written to BEDAŞ and the office board is not forced on that visit. When the work is finished, the paper states the level, the megohms, the row where the neutral was separated, and that the test button dropped. One year of workmanship sits on those rows. Even if the call comes from Seyrantepe or Emniyet Evleri, the measurement is the same: valley damp apart, the hill box apart, and the new riser is not left tied to the old neutral. The appointment time is at the top of the paper, and a minute does not enter the paper.
Valley moisture drops the insulation in a ground-floor box, and the kitchen load meets the threshold. The device is not bridged. Once the electronics are off, the megohmmeter is written, the rotten tail is renewed, and the test button is dropped. A circuit under one megaohm does not return behind the device.
A random neutral joint inside a box comes apart. The office neutral stays on its own bar and the flat neutral stays on its own bar. A computer and a split are not hung on an old cloth-covered tail. A three-phase office riser is not brought near through the flat's single neutral. The work is after the meter.
If the tail crumbles in the fingers, the circuit is taken into surface trunking and blistered plaster is not broken in strips. If there is no earth, the washer body is not bonded to a water pipe. A 30 mA Type A device is fitted. If the lighting is 1.5 mm² it is left at 10 amperes.
The seal belongs to BEDAŞ and we do not open it. The office riser, the neutral split, the hill box and the flat board are after the meter. If the seal is already broken, or the meter body is hot, the company is called and the flat work is written separately the same day.
After the megohmmeter row and the neutral split are written. The band excludes materials: finding a fault 750-1,500 TL, a device or breaker 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a board 6,500-16,000 TL. A minute is not written for the valley road. Workmanship is one year.
Kağıthane on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Kağıthane call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
19 / 19 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google