
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
This note is the Bahçelievler district on the European side, running along the E-5. A neighbourhood of the same name on the Anatolian side is not the subject of this text. In Şirinevler the ground floor is trade: a market, a phone shop, a restaurant, a small office. The floors above are dense apartments left from the 1970s into the 1990s. The same tight fabric is in Yenibosna, Soğanlı, Zafer, Kocasinan, Siyavuşpaşa, Çobançeşme, Hürriyet, Cumhuriyet and Fevziçakmak. The flat's kitchen and the split air conditioner have usually been written on one phase. On a summer evening the oven, the kettle and the compressor heat the same way. Voltage holds at the board and falls at the furthest kitchen socket, and the cover yellows. The fault is not a new estate board. It is an old rewirable board or an early breaker board. The conductor is NYA, and most of them have no residual-current device. The sealed meter is the BEDAŞ limit. The seal wire is not touched. The phase, neutral, earth and flat breaker after the meter outlet are our side. The record is kept by appointment. If the kitchen socket smells, there is an arc mark on the breaker, or the air-conditioner body shocks, the record is placed at the front of the same day. A minute that cannot be kept is not spoken for an E-5 queue or the bridge.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
In a 1970-1990 flat, even when the kitchen branch is 2.5 mm², the air conditioner was tied later to the end of that way. The compressor start and the oven's steady current arrive together. At the board end the voltage looks as if it holds. A True-RMS reading at the furthest kitchen socket writes the drop. The drop comes from the cable length and the resistance of the joints. The caller says the voltage is low and asks for a larger breaker. Enlarging the breaker does not remove the drop. It turns a heating joint into a breaker that opens later. A line found in 1.5 mm² does not go above 16 amperes. A 2.5 mm² kitchen way is not taken to 32 amperes so that it can also carry an air-conditioner start. The air conditioner is pulled in separate NYY from the flat board. The run is not threaded through the kitchen NYA. It gets its own breaker. A reachable isolator is placed beside the outdoor unit. The isolator does not stand in for the meter seal. Indoors the kitchen stays on its own way: oven, kettle, dishwasher. In Yenibosna and Soğanlı, if a second split was added to the same flat, the second machine also goes on a measured separate run, not on the kitchen end. In Zafer and Kocasinan, if the living-room unit at night and the kitchen oven in the evening pile on each other, both are clamped and the paper records which phase they sit on.
A market or a restaurant on the Şirinevler ground floor may have been tied to the kitchen phase of the flat above. The tie is a short bridge made when the sign and the counter fridge were fitted. If the shop has its own sealed meter, that line is not crossed and the seal is not opened. If the shop was added to the dwelling outlet, the addition is removed after the meter and the shop piece is given its own breaker. A new air-conditioning run pulled before that removal still drops in the evening together with the market's cabinet. In Çobançeşme and Siyavuşpaşa the computer of a ground-floor office is on this bridge too. The computer comes off the kitchen way. The Cat6 run uses its own halogen-free trunk and does not share the power trunk. The ends are not left with 'the internet arrived' before a tester shows the pairs. If a camera is to stand by the till, its supply is not piled on the data pair. Its own thin line comes from its own breaker. In Hürriyet and Cumhuriyet, if the same riser carries several shops at once, each shop's amperes are written separately. A separation made before that writing makes everyone forget which counter went quiet the next day.
Rewirable boards still stand on the stairs in Şirinevler and Fevziçakmak. Each time a fuse blows, a thick wire goes in, the wire heats, and the Bakelite blackens. That does not strengthen the kitchen phase. Before the board changes, the room and the shop each fuse corresponds to are written down. Then the branch is read with a 500 V megohmmeter. A kitchen line that does not produce one megaohm is renewed before it is connected to a new breaker. If it is not renewed, the breaker feeds the carbon under the yellow cover and trips again on a summer evening. The board moves into a flame-retardant modular body. The incoming breaker and the outgoing ways come from Schneider or Siemens DIN rail. A 30 mA Type A residual-current device goes on the ways whose insulation is sound. The oven, the dishwasher and the air conditioner do not return to the same way. The air-conditioning way goes to the outdoor unit in NYY. The indoor unit's supply is not split off that way and stolen from a second socket. In Soğanlı, if the indoor unit has been left plugged into the nearest kitchen socket, the plug comes out and the machine sits on its own line. The yellowing on the socket comes back for as long as the plug stays there.
The figures on the 2026 table are for labour. An NYA tail, the NYY drop for the air conditioner, the device and the board box are added separately. Diagnosis is 750-1,500 TL, a breaker or a residual-current device 1,250-3,200 TL, a socket 650-2,800 TL, a separate line for the air conditioner 2,400-5,500 TL, a board 6,500-16,000 TL. This range does not become a contract before the kitchen phase and the air-conditioner phase are clamped. The binding figure is set once the length to the outdoor unit is measured and the carbonised joint is counted and written. The diagnosis fee is set off against the labour if the repair is written up. Labour on the separated kitchen and air-conditioning ways is guaranteed for one year. The guarantee does not reach the air conditioner's gas or a mechanical fault in the compressor. The cable, the breaker and the shop bridge that was separated are inside the guarantee. In Siyavuşpaşa, if the outdoor unit was placed on the balcony later and the cable was hung out of the window, the hanging piece is taken into trunking. An open joint is not left in the rain. Rain should not add a winter leak on top of the summer drop.

On a summer evening in a Bahçelievler block, one flat's oven is not enough. The neighbours' air conditioners pile onto the same phase. At the board the voltage still looks acceptable. At the kitchen socket the cover heats, the colour yellows, and the heel of the plug blackens. This is not a lamp suddenly whitening because a neutral opened. This is the loaded phase dropping at the far end. Two readings are written side by side: the board outlet and the furthest socket. If the difference is large, there is joint resistance or a thin section. The joint is opened and the carbonised NYA tail is cut while the line is dead. The remaining copper is checked under load with a True-RMS clamp. If the insulation has crumbled, that piece is not buried inside a finished wall. Halogen-free trunking is taken on the surface along a service route. The trunk does not carry the air-conditioner NYY and the kitchen NYA in the same compartment. In Çobançeşme, if the riser terminal is hot as well, the heat does not belong only to the flat. A written note is left with the manager: which floor, which phase, the amperes the clamp wrote, with the air conditioners stopped and at start. The block owns the riser. Yellowing inside a flat's cover says the riser screw may be loose as well.
If one flat has a kitchen and no living room, a pole has gone. A pole whose handle is up but whose output is dead is common in a body that has stayed warm for years. That pole is replaced. The ampere rating is not increased to save a yellowed socket. Where the copper section cannot carry the load, the conductor is replaced. If the whole block and the next block are dark and the meter is cold, the report belongs to the distribution company. On that report a screwdriver does not go into the flat board. If a half-lit flat and a burning smell arrive at the same hour, the smell and the arc are first and the dead room waits behind. In Cumhuriyet and Hürriyet, if every flat went dark at once in the evening, that is a larger event than one flat's air conditioner and it is the company's side. If one flat's kitchen socket yellows only in that flat, the event is after the meter and it stays here. The technician asks this split on the phone: is the next building dark as well, or is it only your kitchen. The answer is written into the appointment.
The seal is not opened to get more power. If the contracted power is not enough, that is a report for the distribution company. We separate the kitchen and the air conditioner inside the power that is already there. The separation is made from the board after the meter outlet, not from under the meter cover. If the seal has melted or the meter body is warm, the company line is written first and the flat's cable is measured separately afterwards. We do not cut the seal for a 'stronger breaker'. A cut seal does not enlarge the flat's job. It spoils the record. Even if the breaker on the air-conditioning line is larger than the breaker on the kitchen line, it does not rise above the conductor. The NYY section is chosen for the length to the outdoor unit and the current the machine draws, not for the ampere rating a neighbour uses. A True-RMS clamp writes while the indoor unit and the outdoor unit start together. That figure is the reason for the breaker label. The reason stays on paper. This job in the Bahçelievler district is not the wiring of the neighbourhood with the same name on the Anatolian side. The address is the European-side block on the E-5.
A Bahçelievler call is written at an appointment time. It is not inflated for the state of the E-5 at that moment. A kitchen smell, an arc mark and a shock on the air-conditioner body are placed ahead of a waiting lamp job. A minute for the bridge does not enter the book. The phone call before departure names any tariff gap. On the handover paper the kitchen phase's amperes, the air-conditioner phase's amperes, the megohmmeter result and the outdoor-unit length are separate lines. Those four lines stay so that a second split is not tied to the same end the following summer. Labour on the separated kitchen and air-conditioning ways is guaranteed for one year. Materials sit above the band. At the door there is no round sum spoken before measurement. If there is a smell the same day, that flat is brought forward and a neighbour that looks sound waits its turn. The order follows the kind of fault, not the bridge.
They are not left together. In a 1970-1990 flat, if the oven, the kettle and the compressor have piled onto one way, the far socket drops on a summer evening and the cover yellows. The air conditioner is pulled in separate NYY from the board and sits on its own breaker. The kitchen stays on its own way. The breaker is not chosen larger than the cable can carry. On a 1.5 mm² conductor the breaker stays at 16 amperes. The run is not pulled before the two phases are clamped.
If a market, a restaurant or an office was added by a short bridge to the kitchen phase of the flat above, both loads arrive in the evening. If the shop has its own sealed meter, that line is not crossed. If it was added to the dwelling outlet, the addition is removed after the meter and the shop is given its own breaker. An air-conditioning run pulled before the removal still drops together with the market cabinet. Each shop's amperes are written separately.
It describes the Bahçelievler district on the European side. The E-5, the Şirinevler ground floor and the dense 1970-1990 apartments are inside this address. A neighbourhood of the same name on the Anatolian side is not the subject of this text. The wiring of the two places is not mixed. The appointment is written to the district address.
It is not opened. BEDAŞ keeps the seal as its boundary. If the contracted power is not enough, the report belongs to the distribution company. The kitchen and the air conditioner are separated after the meter, inside the power already there. If the seal has melted or the body is warm, the company line is written first. A cut seal does not enlarge the job. If the whole block is dark and the meter is cold, a screwdriver does not enter the flat board.
It is a labour band, excluding materials. Diagnosis is 750-1,500 TL, a breaker or a residual-current device 1,250-3,200 TL, a socket 650-2,800 TL, a separate line for the air conditioner 2,400-5,500 TL, a board 6,500-16,000 TL. The figure is written once the outdoor-unit length is measured and the two phases are clamped. Diagnosis is set off if the repair is written up. An arrival minute is not part of this sum. Workmanship is guaranteed for one year and does not cover the air conditioner's gas.
Bahçelievler on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Bahçelievler call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
11 / 11 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google