November 2026 updated price and service guide

Districts

Zeytinburnu

5.0 / 5.0 on Google · 2 verified reviews
  • On-call from Pendik · European side by appointment · no minute promise
  • State-Certified Mastery Qualification · Invoiced With A 1 Year Guarantee
  • No Surprise Charges · Clear Price Approval Before Work
  • TSE & ISO referenced materials · Scan slots on the certificates page

A person who asks for an electrician in Zeytinburnu is not looking at the bright board of a new estate. They are looking at streets around Kazlıçeşme where leather workshops were turned into homes, and at the tight flats of Merkezefendi, Seyitnizam, Telsiz, Çırpıcı, Beştelsiz and Sümer. A sewing motor, a hide drum or a finishing fan may still stand on the ground floor while the floors above have become dwellings. Those small motors are still hung on the house riser. The riser is old, the section is thin, and the conductor is NYA. In flats raised from informal rooms into apartment floors the socket cover is burnt, the box is blackened, and the plaster was patched later. When the machine goes quiet, that day's cutting and stitching stop. The loss sits on the workshop's order. On the same visit the technician reads the starter box, the contactor poles and the setting pointer of the thermal overload. If the fault is in the supply, the contactor or the overload, the motor circuit is not left dead and it is not handed to a second trade. A winding that has carbonised inside itself is written separately. An electrical circuit fault is closed on the spot. The sealed meter is a BEDAŞ matter. The seal is not cut and the cover is not opened. The riser, the boxes, the flat board and the workshop starter after the meter outlet are the limit of this job. The call is entered at an appointment time. If a socket smells of burning, an arc has been seen, or a metal body has shocked, the record moves to the front of the same day. A minute figure is not spoken for the coastal road, an E-5 queue or the bridge.

  • Appointment, no minute promise
  • 13 Neighborhoods
  • 30 Services
ElektrikçiGO emergency electrician van, Istanbul 24/7
Service van
Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet

Founding master

Adnan Şemiye18 years in the field

MYK-certified master

Adnan Şemiye reads this job in the field. The price is written before work starts.

From the field

ElektrikçiGO emergency electrician van, Istanbul 24/7Emergency van · ⁦+90 582 403 10 87⁩

A motor hung on the dwelling, the old riser and the burnt socket of a converted floor in Kazlıçeşme

Busbar, contactor and thermal overload on a workshop board

Why a small motor tied to the house riser opens the flat breaker

On the Kazlıçeşme side the ground-floor machine shares a phase with the kettle and the iron upstairs. A sewing motor draws several times its nameplate current at start. If the plate is worn off, the start is read with a True-RMS clamp at the motor terminals, not guessed from a flat socket. The house riser was not pulled to carry that peak. When the breaker opens, the flat goes dark and the drum stops. The stop is the hour the workshop's order was waiting on. The first place to look is not a new socket cover. The starter lid comes off, and supply phase, neutral and earth if it exists are written separately. If the machine is still tied to the flat's 16 ampere socket branch, that tie is removed. Until the machine has its own breaker from the flat board, the neighbour's fridge drops on the same start. The same hang is seen on converted floors in Yeşiltepe and Gökalp: the machine stayed in the home and the riser was never renewed. The technician puts the reading on paper and does not raise the ampere rating and leave the machine on the old wire.

In a flat that climbed from an informal floor into an apartment, sockets were joined to each other with short NYA tails. The joint heats, the screw loosens, and the Bakelite carbonises. The carbonised tail burns again on every start for as long as the motor's plug sits there. The circuit is made dead, the box is opened, the blackened copper is cut back, and the remaining tail is checked with a 500 V megohmmeter. A piece under one megaohm is not landed on a new terminal. If the insulation has crumbled, that branch is not buried inside the patched plaster. It is taken into halogen-free trunking. The trunk is especially needed on a workshop wall where hide dust and damp fill the box. Changing the socket cover and leaving the carbon brings the same smell back on the next order. In Merkezefendi and Telsiz a room taken on later upstairs is often tied to the end of this extra socket. Without its own branch, that room loads the single way that says 'socket' on the board. A True-RMS clamp writes that way's evening load twice: with the motor stopped, and as the motor starts.

Contactor, overload setting and busbar are closed on the same visit

Three things sit side by side in the starter box: the contactor, the thermal overload and a short busbar. If the contactor poles are pitted or welded, the motor either never stops or drops to one phase. A small three-phase drum left on one phase hums and heats the winding. If the overload pointer has been pushed above the nameplate current, it does not see that heat. The pointer is brought back to an unworn plate. If there is no plate, running current is measured with a True-RMS clamp, and the pointer is left near that value and inside the relay's range. It is not pushed to a high notch. Coil voltage is not guessed. It is read at its terminals. A burnt body is replaced with a Schneider or Siemens DIN-rail contactor and a matched thermal overload. The setting is written inside the lid. If the reading from winding to frame has collapsed on a 500 V megohmmeter, that is winding work. The supply is still made safe. A contactor fault is not left open with the words 'let the motor trade come'. The workshop does not wait on a second appointment for an electrical stop. If the machine is to run that day, the circuit is closed that day.

After the motor supply leaves the burnt socket branch, it is pulled in NYY from the flat board. The run is not threaded through the socket NYA. It gets its own breaker, and a 30 mA Type A residual-current device if the insulation is sound. The device is there so the dusty drum's frame leakage is not left in people's hands. The workshop's order computer and barcode reader are not tied into this power trunk. Cat6 goes in its own halogen-free trunk, and the ends are not handed over until a tester shows the pairs. The 2026 schedule is labour only. Materials are written separately. Fault reading is in the 750-1,500 TL band, a breaker or residual-current device 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning line added later 2,400-5,500 TL, a board 6,500-16,000 TL. The contactor and the cable sit outside that band. The binding figure is written after section and current are measured, and before work starts. The survey comes off the labour if the repair is accepted. The labour on that starter and those sockets is guaranteed for one year. The guarantee does not cover a blade or a belt on the drum.

Shared neutral, a missing earth and the seal line in a converted flat

Recessed LED spots and track lighting on a ceiling

Socket carbon in patched plaster and a heating riser neutral

On a converted floor the living-room socket, the kitchen and the plug of a machine left behind meet on the same neutral screw. In the evening, when both the flat and the drum load up, the screw heats, contact resistance rises, and the lamp flares and dies by turns. The caller blames the socket. At the flat intake the three voltages go on the paper as phase to neutral, phase to earth and neutral to earth. If phase to neutral has risen past 180 volts, the plugs are pulled. The fridge and the sewing control are not left on that voltage. The ampere rating is not raised. A conductor of 1.5 mm² is held at 16 amperes and is not taken higher. A 2.5 mm² socket way is not widened so that it can carry a motor start. The motor stays on its own NYY run. That riser is the building's property. Which floor's phase drew how many amperes with the motor stopped and at start is left in writing for the manager. In Çırpıcı and Beştelsiz the neighbouring riser is named on the same paper so the next-door flat does not see the same flare the following evening. Plaster is not opened again just to clear carbon. The trunk goes on the surface and does not cut a worn or patched face.

The riser screw is not limited to the flat owner. A loose neutral moves the ground-floor workshop and the home upstairs together. The screw is chosen and tightened with the manager. The seal under the meter cover is not an excuse for this job. Nobody opens the seal to say 'let us tighten from there too'. If the neighbouring buildings are dark as well and the meter body is cold, the report belongs to the distribution company. If only this starter is silent and the flat sockets are alive, the fault is after the meter and it stays here. In Sümer and Seyitnizam, when one flat on the same riser is lit and the workshop phase is dead, the open pole is looked for on the board. A handle that is up is not counted as healthy. A pole with no output is replaced. Where the copper section is too small, the conductor is replaced. The ampere label is not matched to the wire by force. Any tariff gap is named on the phone before the technician leaves the shop. A Zeytinburnu time is an appointment. Burning smell, arcing and shock are written at the head of that day. A duration is not set for the bridge or the coast.

Frame leakage, a 30 mA Type A device and the limit after the meter

In a converted flat a protective conductor was often never pulled. If a drum frame or a washing machine has been clamped to a radiator pipe, that does not count as earth. A pipe is not a path for leakage. If there is a shock, the plug comes out. The protective conductor is pulled with the renewed cable inside the halogen-free trunk and lands on the earth bar in the board. An old board with no bar, when it moves into a flame-retardant modular enclosure, is built with Schneider or Siemens DIN breakers. A 30 mA Type A residual-current device goes on a branch whose insulation is sound. No bridge is made because the device trips when the motor starts. A bridge leaves a dusty frame in the hand. The circuits are separated with a 500 V megohmmeter. Leakage can come from damp in the drum's terminal box or from carbon in a kitchen socket. The two are not piled on one device. A piece under one megaohm does not see voltage. The device returns only after a sound circuit is proved. On patched floors in Nuripaşa, if a box cover is missing, damp spoils this separation further. A cover goes on. An open joint is not left.

The handover paper has four lines: the overload setting, the section of the motor cable, the megohmmeter result, and which socket was separated from the machine. The paper exists so that someone else does not join that way together again the next day. The seal line stands separately at the bottom. If the meter side is warm or the seal wire is broken, the photo note is for BEDAŞ. A screwdriver does not enter the board through the meter cover. A loose busbar after the meter is the place we tighten. If the busbar screw is hot, the workshop load and the flat load have met at the same point. Tightening the screw without separating them only postpones the heat. On a Zeytinburnu appointment a burning smell, the sound of an arc and a shock are placed ahead of waiting work. The coast and the bridge are not written as an arrival minute. Workmanship is guaranteed for one year and covers the circuit that was measured. Materials, the contactor, the NYY and the trunk are added on top of the labour band. The binding figure is discussed after measurement. It is not invented at the door.

Frequently asked

Frequently asked

Why does a stopped motor in Zeytinburnu not wait for a second trade?

If the stop is in the contactor, the overload setting or a loose supply, the circuit is closed on the same visit. The workshop's cutting and stitching are not left to a second appointment for an electrical fault. If the winding has collapsed to the frame on the megohmmeter, that is written as winding work. The supply is still made safe. A welded contactor is not left open. The setting is brought to the nameplate current or to the measured running current. It is not pushed to a high notch.

Why does a burnt socket in Kazlıçeşme not end with a new cover?

A cover does not hide a carbonised NYA tail. The joint is opened dead, the blackened copper is cut back, and the remaining tail is checked with a 500 V megohmmeter. What is under one megaohm is not put on a new screw. If the motor plug still sits in that socket, the run is taken onto a separate NYY supply from the flat board. The same carbon is not buried in the patched plaster. Crumbled insulation comes out into halogen-free trunking. Changing the cover and leaving the machine in place brings the same burn back on the next order.

Who opens a meter seal in Zeytinburnu?

The seal is not ours to open. The sealed meter and the side before the cover are a BEDAŞ report. The riser screw after the meter outlet, the busbar, the flat board and the starter are our measurement. If the seal wire is broken or the meter body is warm, the note goes to the distribution company. If the neighbouring buildings are dark and the meter is cold, the fault is with the company too. If only the workshop is silent and the home sockets are alive, the work stays after the meter.

How is the 2026 labour band for electrical work in Zeytinburnu fixed?

The band is labour, excluding materials. Fault reading is 750-1,500 TL, a breaker or residual-current device 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning line 2,400-5,500 TL, a board 6,500-16,000 TL. The contactor, the NYY and the trunk are written separately. The binding figure is set after section and current are measured, and before work starts. The survey comes off the labour if the repair is accepted. That figure does not hide an arrival minute. The labour guarantee runs for one year.

Why does the residual-current device trip when the workshop motor starts?

At start, frame leakage, a damp terminal box or a carbonised socket crosses the threshold. The device is not bridged. The circuits are separated with a 500 V megohmmeter, and the motor supply is taken off the socket branch onto its own 30 mA Type A device. A piece under one megaohm does not see voltage. If there is no earth, a protective conductor is pulled in the trunk. A water or radiator pipe is not written in place of earth. The device returns only once a sound circuit is proved.

How is a night or Sunday call planned in Zeytinburnu?

Zeytinburnu on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

Services

PLC programmingindustrial electrical serviceShort circuithome–plant electrical serviceSocket and switchhome electrical serviceResidual-current devicehome electrical serviceEarthinghome–plant electrical serviceCable and circuit runhome electrical serviceRewiringhome electrical serviceTelevision mountingelectrical fitting serviceAC Electrical Wiringresidential–commercial AC serviceIntercom & Doorbell Systemsresidential intercom serviceFuse & Panel Faultsconsumer unit & panel serviceChandelier Mounting & Lightingresidential lighting serviceInternet & Data Cablingresidential & office network serviceElectrical Fault Repair24/7 emergency fault serviceDistribution Board Setupresidential–commercial panel serviceEarthing & Lightning Protectionbuilding earthing & surge serviceSecurity Camera Systemssurveillance & CCTV serviceEV Charger InstallationEV charging infrastructure serviceSmart Home Automationsmart home & KNX/Zigbee serviceHalf The House Has No Powerpartial outage & phase loss repairBurning Smell and Crackling Socketsemergency thermal inspection & arc repairVoltage Fluctuation, Regulators and UPSvoltage protection & uninterruptible powerGenerator and ATS Paneltransfer panelMeter, Main Switch and Risercustomer side after the meterLift and Hydrophore Panelpanel supplySolar Inverter Board Connectioncustomer-side AC outputPanel faultLighting installationBreaker replacementSecurity camera

What Can You See At Home? Fast Diagnosis By Symptom

There is a burning smell from a socket

Single socket being checked for burn marks

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The breaker keeps tripping

Main switch and breaker row

Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The flat has lost power

Meter measuring voltage

If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The breaker trips when the AC or oven starts

Breaker dedicated to an appliance circuit

Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

A chandelier needs fitting

Chandelier on the ceiling

The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

I get a shock from the sink or washing machine

Washing machine socket connection

There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

How Our Field Team Works A Call

On Zeytinburnu call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.

  1. 01
    Symptom
    The residual current device trips again the instant it is reset
    Measurement
    Branches are separated one by one at the board and each leg measured with a 500 V megohmmeter. Insulation resistance below 1 Megaohm shows that run's insulation is no longer doing its job.
    Intervention
    The faulty leg is isolated and the refrigerator, boiler and lighting restored within the first ten minutes. If damp is the cause the junction box is dried and encapsulated in dielectric gel; if the insulation is charred the run is renewed back to the board.
  2. 02
    Symptom
    A burning smell from a socket with a deformed face plate
    Measurement
    A FLIR thermal sweep is taken under load; where a loose screw connection has carbonised the terminal, that point reads between 160 and 200 degrees and is found without opening the wall.
    Intervention
    Blackened conductor ends are cut back to clean copper, the back-box replaced and the joint closed with a Wago 221 lever terminal. Every screw connection is tightened with a calibrated screwdriver to between 2.5 and 3.5 Nm.
  3. 03
    Symptom
    Half the flat has no power while the other half works
    Measurement
    Voltage is read phase by phase downstream of the meter. On neutral loss one phase measures above 250 volts and another around 180; that pattern burns appliance boards the same night.
    Intervention
    The main neutral terminals are opened, oxidised surfaces cleaned with dielectric solvent and torqued to specification. An over/undervoltage protection relay is added so appliances survive the next neutral loss.

2026 Electrician Prices and Recently Completed Jobs

The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.

2026 Electrician Prices and Recently Completed Jobs
JobTypical price rangeWhat is included
Fault diagnosis and measured survey750 TRY – 1,500 TRYDiagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted.
Breaker / RCD replacement1,250 TRY – 3,200 TRYA 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified.
Dedicated air conditioning circuit2,400 TRY – 5,500 TRY3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route.
Flat board renewal (modular DIN)6,500 TRY – 16,000 TRYVaries with room count, circuit splitting and whether a surge arrester is included.
Chandelier, spot and socket installation650 TRY – 2,800 TRYPriced per unit; heavy chandeliers include a steel anchor set into structural concrete.
Internet and Cat6 data cabling1,100 TRY – 4,200 TRYIncludes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester.
Factory / power factor periodic maintenance4,500 TRY – 18,000 TRYBy panel and step count; includes a thermal sweep and a written measurement report.

Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.

A Free Five-Point Board Safety Check On Every Call-Out

Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.

01

All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.

02

The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.

03

Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.

04

Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.

05

Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.

Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.

Services We Provide In This Area

Neighborhoods

Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.

Show neighborhoods

Google Review

Happy With The Work? Leave Us 5★ On Google

Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.

Current rating: 5.0 / 5.0 · 2 verified reviews

Leave 5★ On Google
QR code opening the ElektrikçiGO Google review page
Scan with your phone after the job