November 2026 updated price and service guide

Districts

Eyüpsultan

5.0 / 5.0 on Google · 2 verified reviews
  • On-call from Pendik · European side by appointment · no minute promise
  • State-Certified Mastery Qualification · Invoiced With A 1 Year Guarantee
  • No Surprise Charges · Clear Price Approval Before Work
  • TSE & ISO referenced materials · Scan slots on the certificates page

Inside Eyüpsultan one district holds two wiring stocks. In the historic core and on the Pierre Loti slope the wall is masonry, the cable is NYA, and a protective conductor was never pulled. In Düğmeciler, İslambey, Nişanca and Defterdar a metal fitting tingles and the bathroom box is damp. Alibeyköy, Güzeltepe, Akşemsettin, Emniyettepe and Karadolap are later housing. A board exists, but the earth bar was left empty or the residual-current device was bridged. In the Göktürk villas the fault is different: a long NYY crossing the garden, a tired gasket on the outdoor socket, and a device that drops in the rain. The same book holds both stocks. The same repair sentence is not written for both. The sealed meter belongs to BEDAŞ in both buildings. The seal stays shut in our hands. The internal cable after the meter, the earth bar and the end of the garden branch are our work. The record is an appointment. If a wall socket smells, a spark has been seen, or the tap tingles, the visit is brought forward the same day. A minute figure is not given for the Golden Horn crossing or the Göktürk hill.

  • Appointment, no minute promise
  • 29 Neighborhoods
  • 30 Services
Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet
Adnan Şemiye
Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet

Founding master

Adnan Şemiye18 years in the field

MYK-certified master

Adnan Şemiye reads this job in the field. The price is written before work starts.

From the field

ElektrikçiGO emergency electrician van, Istanbul 24/7Emergency van · ⁦+90 582 403 10 87⁩

NYA and a missing earth in the historic core and on the Pierre Loti slope

A 30 mA residual-current device and an earth bar left empty on an old flat board

Two-wire cable in a masonry wall and metal that tingles

In a house on the Pierre Loti slope the socket is two-wire. Phase and neutral are there. A protective conductor is not inside the plaster. When a metal sconce or a washer body comes to the hand, the tingle starts. The tingle is not waved off as 'static'. The plug comes out, and voltage between the body and a real earth point is read with a True-RMS meter. A water pipe or a radiator clamp does not count as that point. A pipe can look like a path for leakage, then it breaks that path at a joint. The protective conductor is pulled in halogen-free trunking together with the renewed cable and lands on the earth bar in the board. Historic plaster is not broken so that an earth can exist. The trunk stays on the surface and does not cut the masonry face. In Düğmeciler and İslambey the bathroom box collects the slope's damp. Damp lowers the insulation. A piece that does not show one megaohm on a 500 V megohmmeter does not see voltage. That piece is renewed in the trunk. It is not pushed back inside the wall with the old NYA. In Nişanca, if a chandelier tube has been used in place of a conductor, the tube comes off and the chandelier is landed on its own NYA pair and a separate protective tail.

On the Defterdar side, if kitchen and bathroom have stayed on the same two-wire circuit, the circuit is split. The washer, the cooker and the lighting are not piled on one 16 ampere way. If the conductor is 1.5 mm², the breaker does not go above 16 amperes. If the section is short, the NYA is renewed inside the trunk. A new breaker is not fitted before insulation is proved. A 30 mA Type A residual-current device comes in after the protective conductor has landed on the bar and the megohmmeter has said the line is sound. The device is not put in place of earth. A device fitted before the earth is pulled sees some frame leakage and misses some. A person describes that as 'it shocks sometimes'. If it shocks sometimes, the plug comes out, the conductor is completed, then the device comes. If an old box in the masonry wall has carbonised, the tail is cut back and the remaining copper is checked under load with a True-RMS clamp. If the load is larger than the line can carry, appliances are reduced. A larger ampere rating is not the repair. On the damp plaster of the Pierre Loti hill an open joint is not left. A cover goes on and the mouth of the trunk is closed.

Filling an empty bar in Alibeyköy housing

A flat in Alibeyköy and Güzeltepe is not the two-wire circuit of a historic house. A board was fitted, a rail is there, but the earth bar is empty, or the single green-yellow tail from the bathroom never landed on the bar. The tail was cut in the ceiling and left with the words 'there was no earth'. A tail left that way leads both to a device that trips at night and to a frame that tingles. The tail is followed first. If it is cut in the ceiling, it is completed to the bar in halogen-free trunking. A sound wall is not broken to drop plaster. In Akşemsettin and Emniyettepe a bridge across the device is seen. The bridge was put there because a bathroom fan or a damp socket caused trips. The bridge comes off. Fan and socket are separated with a 500 V megohmmeter. A 30 mA Type A device returns on the sound line. The rotten one is renewed. In Karadolap, if a balcony closed in later was made into a room and the room was tied to an old socket, that room is given its own way. Piling load on the old socket does not stand in for filling the empty bar.

If the Alibeyköy board has burnt, the body moves into a flame-retardant modular box. Breakers are chosen from Schneider or Siemens DIN rail, and the ampere rating is written to the conductor section. The cooker and the washer are not left on the same way. An air conditioner added later is not bridged onto the end of the bathroom circuit. An air conditioner wants its own circuit. The labour band for that circuit, excluding materials, is the 2,400-5,500 TL range, and it is fixed only once the route is measured. The flat's internet is not tied to the old NYA pair. Cat6 goes in its own trunk, stays away from the socket line, and the ends are not left before a tester shows the pairs. A camera supply is not added on top of the data pair. The masonry repair in the historic core and the empty bar in Alibeyköy are not written on the same work order. Even if the two stocks sit side by side on the same day, their papers are separate. One is surface trunking and an earth that never existed. The other is a green-yellow tail that existed and was never landed.

Long garden NYY and a wet outdoor socket on a Göktürk villa

Recessed LED spots and track lighting on a ceiling

A device that drops in the rain is not sensitive, the gasket is tired

In a Göktürk villa the living room is dry and the garden socket is wet. When a 30 mA Type A residual-current device drops in the rain, the house goes dark. The caller finds the device sensitive and asks for a bridge. A bridge leaves a wet body on a socket above the grass. The fault is not sensitivity. The outdoor socket's gasket is tired, the gland has loosened, or a joint has stayed under the soil. The socket is dried, the cover and gasket are renewed, and the gland is tightened so that it holds the NYY sheath fully. The joint is not left buried. A joint stands only in a box that can be reached. If the box cover is missing, damp walks into the cable and the megohmmeter result falls. A 500 V megohmmeter does not close the garden way again before drying and the gasket work are finished. A garden piece that does not show one megaohm does not see voltage. That piece is replaced. The house's internal branches leave the garden way. So that rain does not also kill the villa's fridge, the garden sits on its own device and its own breaker. If the inside is sound, the inside device stays up in the rain.

If the garden NYY is long, the voltage at the board and the socket at the foot of the fence are not the same. A True-RMS clamp writes both ends. If the drop at the far end is large, the section is short. Raising the breaker does not remove the drop. It heats the end. The cable is renewed for the measured length. The new NYY is not threaded through socket NYA. If garden lighting and the outdoor socket meet at the same end, they are split. A lighting fault should not travel to the socket, and socket damp should not travel to the living room. The villa's data cable is not pushed into this NYY pipe. Cat6 goes on a separate route and the ends are proved on a tester. If a camera is to be fed from the garden, the supply is on its own thin line. The data pair does not carry power. Before the route is dug, the place where the existing NYY is jointed is found. A blind dig opens a second leak on a sound cable. When the work is finished the outdoor socket is not tested with a wet cloth. The test, after the gasketed cover is closed and the megohmmeter result is on paper, is the device itself.

Seal, band and appointment are not one sentence for two stocks

In the masonry house and in the Göktürk villa alike, the meter cover is not opened with a screwdriver. The seal is the BEDAŞ limit. If the meter body is hot or the seal wire is broken, the report belongs to the distribution company. A new wire is not fitted by us in place of a broken one. After the meter, the work is the protective conductor inside the trunk in the historic house, the green-yellow tail landing on the empty bar in Alibeyköy, and the board end of the garden NYY in the villa. All three are after the meter, and all three are written on separate lines. If the neighbouring buildings are dark and the meter is cold, the problem is in distribution. If only the garden socket is dead and the living room is up, the fault is on the garden way. If only a metal sconce tingles and the neighbouring house is lit, the fault is a missing earth. This split is not mixed up at the door. The masonry on the Golden Horn side and the villa on the Göktürk hill are not put in the same sentence about duration. Both are appointments. A minute is written neither to the bridge nor to the hill.

The 2026 schedule is a labour band, not materials. Separating a fault is 750-1,500 TL, a breaker or a residual-current device 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a board 6,500-16,000 TL. The figure is fixed once the garden NYY length, the trunk length on the masonry wall, and the green-yellow tail completed in the Alibeyköy ceiling have been measured. Materials, NYY, NYA, the device and the box are outside the band. The measurement fee comes off the total once the job is accepted. The workmanship guarantee covers one year and covers the stock that was measured. Even in the same guarantee sentence, the garden gasket and the historic house's trunk are separate lines. A burning smell, a spark and a shock, villa rain and masonry tingle, are brought to the front of the same day. A waiting lamp job stays behind them. Any difference in the tariff is said on the phone before the technician leaves. At the door, no word is given that rounds the two stocks into one figure.

Frequently asked

Frequently asked

Are a historic house and a Göktürk villa the same fault in Eyüpsultan?

They are not. The historic core and the Pierre Loti slope are masonry, NYA, and an earth that was never pulled. Alibeyköy is later housing. A board exists, the earth bar is empty, or the device is bridged. A Göktürk villa is a long garden NYY and a wet outdoor socket. All three are in the same district and all three are written on separate paper. The same device sentence is not used both for a sconce on the hill and for a socket at the foot of the fence.

Does a water pipe stand in for earth on the Pierre Loti slope?

It does not. A pipe cuts the path at a joint and the body tingles again. The protective conductor is pulled in halogen-free trunking and lands on the earth bar. Historic plaster is not broken for this job. A 30 mA Type A device is fitted after the conductor has landed on the bar and a 500 V megohmmeter has said the line is sound. The device is not put in place of earth. If there is a tingle, the plug comes out and the conductor is completed.

Why is a device that trips in the rain in Göktürk not bridged?

Rain means a tired gasket, a loose gland or a joint buried in soil, not a sensitive device. A bridge leaves a wet socket above the grass. The socket is dried, the gasket and gland are renewed, and the joint is brought into a box that can be reached. The garden way is not closed before a 500 V megohmmeter shows one megaohm. The inside of the house is separated from the garden so rain does not also kill the fridge. The garden stays on its own 30 mA Type A device.

On which stock is a meter seal opened in Eyüpsultan?

On none of them. The seal is not opened in a historic house, an Alibeyköy flat or a Göktürk villa. A hot meter or a broken wire is a BEDAŞ report. We do not fit a wire in place of a broken one. The internal cable after the meter, the tail landing on the empty bar, and the board side of the garden NYY are our measurement. If the neighbouring buildings are dark and the meter is cold, the problem is in distribution.

How is the 2026 labour band in Eyüpsultan fixed?

What is published is a labour band, and materials sit outside it. Separating a fault is 750-1,500 TL, a breaker or a residual-current device 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a board 6,500-16,000 TL. The figure is written once the garden length and the length in the masonry trunk are measured. The two stocks are not rounded into one figure. The measurement fee comes off once the job is accepted. A minute does not enter this figure. Labour on the measured stock is guaranteed for one year.

How is a night or Sunday call planned in Eyüpsultan?

Eyüpsultan on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

Services

PLC programmingindustrial electrical serviceShort circuithome–plant electrical serviceSocket and switchhome electrical serviceResidual-current devicehome electrical serviceEarthinghome–plant electrical serviceCable and circuit runhome electrical serviceRewiringhome electrical serviceTelevision mountingelectrical fitting serviceAC Electrical Wiringresidential–commercial AC serviceIntercom & Doorbell Systemsresidential intercom serviceFuse & Panel Faultsconsumer unit & panel serviceChandelier Mounting & Lightingresidential lighting serviceInternet & Data Cablingresidential & office network serviceElectrical Fault Repair24/7 emergency fault serviceDistribution Board Setupresidential–commercial panel serviceEarthing & Lightning Protectionbuilding earthing & surge serviceSecurity Camera Systemssurveillance & CCTV serviceEV Charger InstallationEV charging infrastructure serviceSmart Home Automationsmart home & KNX/Zigbee serviceHalf The House Has No Powerpartial outage & phase loss repairBurning Smell and Crackling Socketsemergency thermal inspection & arc repairVoltage Fluctuation, Regulators and UPSvoltage protection & uninterruptible powerGenerator and ATS Paneltransfer panelMeter, Main Switch and Risercustomer side after the meterLift and Hydrophore Panelpanel supplySolar Inverter Board Connectioncustomer-side AC outputPanel faultLighting installationBreaker replacementSecurity camera

What Can You See At Home? Fast Diagnosis By Symptom

There is a burning smell from a socket

Single socket being checked for burn marks

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The breaker keeps tripping

Main switch and breaker row

Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The flat has lost power

Meter measuring voltage

If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

The breaker trips when the AC or oven starts

Breaker dedicated to an appliance circuit

Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

A chandelier needs fitting

Chandelier on the ceiling

The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

I get a shock from the sink or washing machine

Washing machine socket connection

There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.

Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.

Fix and price

How Our Field Team Works A Call

On Eyüpsultan call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.

  1. 01
    Symptom
    The residual current device trips again the instant it is reset
    Measurement
    Branches are separated one by one at the board and each leg measured with a 500 V megohmmeter. Insulation resistance below 1 Megaohm shows that run's insulation is no longer doing its job.
    Intervention
    The faulty leg is isolated and the refrigerator, boiler and lighting restored within the first ten minutes. If damp is the cause the junction box is dried and encapsulated in dielectric gel; if the insulation is charred the run is renewed back to the board.
  2. 02
    Symptom
    A burning smell from a socket with a deformed face plate
    Measurement
    A FLIR thermal sweep is taken under load; where a loose screw connection has carbonised the terminal, that point reads between 160 and 200 degrees and is found without opening the wall.
    Intervention
    Blackened conductor ends are cut back to clean copper, the back-box replaced and the joint closed with a Wago 221 lever terminal. Every screw connection is tightened with a calibrated screwdriver to between 2.5 and 3.5 Nm.
  3. 03
    Symptom
    Half the flat has no power while the other half works
    Measurement
    Voltage is read phase by phase downstream of the meter. On neutral loss one phase measures above 250 volts and another around 180; that pattern burns appliance boards the same night.
    Intervention
    The main neutral terminals are opened, oxidised surfaces cleaned with dielectric solvent and torqued to specification. An over/undervoltage protection relay is added so appliances survive the next neutral loss.

2026 Electrician Prices and Recently Completed Jobs

The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.

2026 Electrician Prices and Recently Completed Jobs
JobTypical price rangeWhat is included
Fault diagnosis and measured survey750 TRY – 1,500 TRYDiagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted.
Breaker / RCD replacement1,250 TRY – 3,200 TRYA 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified.
Dedicated air conditioning circuit2,400 TRY – 5,500 TRY3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route.
Flat board renewal (modular DIN)6,500 TRY – 16,000 TRYVaries with room count, circuit splitting and whether a surge arrester is included.
Chandelier, spot and socket installation650 TRY – 2,800 TRYPriced per unit; heavy chandeliers include a steel anchor set into structural concrete.
Internet and Cat6 data cabling1,100 TRY – 4,200 TRYIncludes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester.
Factory / power factor periodic maintenance4,500 TRY – 18,000 TRYBy panel and step count; includes a thermal sweep and a written measurement report.

Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.

A Free Five-Point Board Safety Check On Every Call-Out

Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.

01

All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.

02

The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.

03

Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.

04

Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.

05

Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.

Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.

Services We Provide In This Area

Neighborhoods

Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.

Show neighborhoods

Google Review

Happy With The Work? Leave Us 5★ On Google

Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.

Current rating: 5.0 / 5.0 · 2 verified reviews

Leave 5★ On Google
QR code opening the ElektrikçiGO Google review page
Scan with your phone after the job