Pendik industrial

Stop a dead production line.

Written for a stopped production line. On contracted sites the response time is guaranteed by contract; uncontracted calls are routed to the on-call industrial team.

Adnan Şemiye, ElektrikçiGO electrician, fitting an Istanbul meter cabinet
Adnan Şemiye

Emergency response

120 min first response, an 8-hour arrival window, and a 48-hour resolve window belong only to SLA-PENDIK-2026-001. A new plant does not inherit those minutes before signature.

First response
120min
Arrival window
8h
Resolve window
48h

SLA-PENDIK-2026-001

Field work

  • PLC

    PLC automation

    Power and I/O. A program change follows the manual of the equipment on site.

  • VFD

    VFD drive

    Drive fault, motor cable, and panel cooling.

  • PANEL

    Panel maintenance

    Contactor, overload, and busbar. Torque and heat.

  • A

    High current

    Main breaker and feeder. Conductor size is measured on site. Above 630 A is not a catalog step; it needs its own survey.

Intake

Factory intake

Step 1 / 3

Pendik industrial electrical service | ElektrikçiGO