
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
The Sultangazi electrician note looks at the tight housing in Gazi and at the single-motor workshop on the ground floor. The İkitelli organised-industry corridor is not the claim of this page. The work here is the flat board and the starter by the door in Cumhuriyet, Esentepe, İsmetpaşa, Zübeyde Hanım, Uğur Mumcu, 50. Yıl and Cebeci. The starter is an isolator, a contactor and an overload relay. The motor plate says 4 or 5.5 amperes and the relay is found jumpered, or turned up to 12 amperes. The home board is tired at the same hour from the washer and the cooker. If the workshop current has been piled onto that tired circuit, the flat breaker drops at noon when the motor starts. The meter seal belongs to BEDAŞ and it is not opened. The work is on the busbar after the meter, on the starter and on the flat way. No minute is quoted for Sultangazi, and no night-arrival notice is given. The call is written as an appointment. A burning smell or a shock is moved to the front of the same day. A stopped small bench is also taken to an appointment time, and no duration is set. Labour is written after measurement, and the guarantee is one year.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
In Gazi the ground floor is often a single bench: a door shop, a small lathe, a dough mixer, or one compressor. The plate on the motor cover states the current. In the starter box the overload relay is either jumpered with wire or the dial is set at twice the plate. It is left that way 'so it will not trip'. When the relay does not trip, the winding heats, the terminal blackens, and the contactor tips weld. A welded contactor does not stop the motor, and a burning smell comes out of the box. The first job is to remove the jumper and read the plate. After the start has finished, a clamp goes on each of the three phases separately. If the currents are close to each other and at the plate value, the relay is set to that value and its class is chosen for the motor's work. On a bench with a short start, class 10 is enough. On a heavy pulley, class 20 is discussed, and a jumper is not. If one phase is low, the cable terminal or the winding is looked at, and the missing phase is not hidden by turning the relay up. On a missing phase the motor tries to turn on two windings and the remaining winding burns.
The contactor is read on its own. The coil voltage is the value on its plate, 230 volts in most small workshops. If it buzzes while pulled in and the magnet face is dirty, the coil is changed and the face is wiped before a contact welds. The busbar screw, like the row on the copper in the photograph, has to sit at torque. A loose busbar screw heats on the starting current and the starter body is hot at noon. The screw is tightened, the conductor section is chosen for the motor current, and 1.5 mm² NYA is not left on a three-phase motor. If the feed was taken from the washer way of the flat board, it comes off there. The workshop drops, after the meter, on its own way, in NYM of a fitting section or in NYY on a short run. If the building riser does not give three phases, a 400 volt motor that does not match the plate is not fitted. If the plate says 230 volt single phase, the starter is built for that, and a phase that is not there is not invented. The same rule stands in a single-storey shop toward Habibler and Yayla: plate, clamp, relay setting.
In a Gazi block the upper floors are dwellings. The board is old, the socket circuit is tired, and the cooker and the washer may be on the same 16 amp way. That circuit does not carry a workshop motor's start. The starting current is several times the plate current, the home breaker drops magnetically, and the householder blames the motor. The split is this: the flat way stays on 2.5 mm² NYM and its own 16 amp type B breaker, and the motor drops to its own starter. The only shared point is the main switch after the meter, and only if its section is enough. If it is not, a riser note is written to the manager and the seal is not opened. If the flat has no residual-current device, a 30 mA Type A unit goes in. The workshop relay is not confused with the flat's device. The motor body is earthed from the protective conductor, not from water. A terminal thrown onto a water pipe does not count as an earth. In Esentepe and İsmetpaşa the same stair has both a dough mixer and an upstairs cooker. If the two were tightened into the same box terminal, the joint comes apart.
On the dwelling side a carbonised socket tail is cut back, and if the lighting is 1.5 mm² it is left at 10 amperes. If the kitchen was tapped from a lighting box, it is taken onto its own 2.5 mm² way and it is not enlarged as if it were workshop work. The 2026 bands are labour excluding materials: fault finding 750-1,500 TL, a breaker or residual-current device 1,250-3,200 TL, a socket or light fitting 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL. Changing the relay and the contactor in the starter is written inside the device band, according to the measured motor power. There is no claim of a large board, because the work is one motor and the flat board. The binding figure comes after the clamp row and the plate current are written. Workmanship is one year. If the jumper is put back, the guarantee stops on that relay. In Zübeyde Hanım and Uğur Mumcu the same band is applied with the same measurement paper.

When the motor cannot start at noon, the shop owner wants it immediately. Immediately is not a promised minute. When the bench stops, the piece stays on the table, and that is the shop's loss. Our paper is an appointment time. If a burning smell comes from the box, or the body shocks, the call is moved to the front of the same day. Outside that, a call in Gazi, Cumhuriyet and 50. Yıl is written as an appointment, and no duration is set. Three things are asked on the phone before setting off: the volts and amperes on the motor plate, whether there is a jumper in the starter, and whether the flat breaker drops together with the motor. The three answers say whether the band is fault finding or the relay and contactor. If the board is to be renewed, the 6,500-16,000 TL band becomes firm only after the section is seen on site. A fixed board price is not left on the phone.
On site the order does not change. Power is cut first, the jumper comes off if there is one, and the busbar screw and the motor terminal are checked. The clamp writes the three phases off load and on load. The relay setting is brought to the plate. If the flat breaker still drops, the motor circuit leaves the home way. The split is after the meter. The inside of the sealed cover is BEDAŞ's line. If the street and the next building are dark and the meter is cold, a company report is opened and the starter is not forced on that visit. If there is a shock, the body conductor is measured and a jumper thrown onto a pipe comes off. When the work is finished, the paper holds the plate current, the three measured phases, the relay class, and the row that says the flat way was separated. One year of workmanship sits on those rows. Before leaving, the technician says which band it is, excluding materials: finding a fault 750-1,500 TL, a relay or breaker 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL.
No. The İkitelli organised-industry corridor is not the claim of this page. Here there is the housing of Gazi and the neighbouring quarters, and a single-motor workshop on the ground floor. The starter is an isolator, a contactor and an overload relay.
The jumper does not see current above the plate. The winding heats, the contactor welds, and the motor does not stop. The jumper comes off, the three phases are written with a clamp, and the relay is brought to the plate current. If one phase is low, it is not hidden by turning the relay up.
The starting current does not fit on a 16 amp way shared with the washer and the cooker. The motor is taken, after the meter, to its own starter. The flat way stays on 2.5 mm² NYM and its own breaker. The split is not made ahead of the seal.
No. The seal stays. The starter, the busbar screw and the flat board are after the meter. If the seal is already broken, or the meter body is hot, the report is written to BEDAŞ and the workshop way is measured separately.
After the clamp row and the plate current are written. The band excludes materials: finding a fault 750-1,500 TL, a relay or breaker 1,250-3,200 TL, a socket 650-2,800 TL, an air-conditioning circuit 2,400-5,500 TL, a board 6,500-16,000 TL. There is no minute. Workmanship is one year.
Sultangazi on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Sultangazi call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
15 / 15 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google