
Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
November 2026 updated price and service guide
Districts
Someone calling an electrician in Başakşehir is standing in a housing estate handed over in stages, not in an old street shop. The staged handovers of Kayaşehir, the Kayabaşı blocks and the Bahçeşehir housing are where this job sits. In most flats the kitchen was finished after the occupancy paper. The stage contractor wrote that three phases exist in the shaft, then left the induction hob and the living-room air conditioner on one phase. In the evening, when both draw together, that phase sits down and the other two stand idle. Current from the LED drivers and adapters piled up along the stage heats the neutral. Başakşehir Çam and Sakura City Hospital and the large shopping buildings nearby are close. This page is not an operating contract for those sites. The work is the residential board inside the estate and the flat circuit after the meter. The sealed meter belongs to BEDAŞ. We do not open the seal. Başakşehir is on the European side, and the call is written in the appointment book. A burning smell, arcing or a shock is moved to the front of the same day. A duration figure is not spoken for the stage barrier or the internal service road.


Founding master
Adnan Şemiye18 years in the field
MYK-certified master
Adnan Şemiye reads this job in the field. The price is written before work starts.
From the field
Emergency van · +90 582 403 10 87
On the Kayaşehir stages the first board was arranged for a resistive cooker and a single air conditioner. When the owner later fits an induction hob, that load is added to the phase the living-room unit already occupies. If the dishwasher was left on the same way, L1 approaches thirty amperes in the evening and L2 and L3 stay in single figures. Before this picture is called a transformer fault, two points are written down. The first is the output of the sealed meter. The second is under the flat's main breaker. If the meter output is sound on all three phases and the sag is only inside the flat, the pile-up is after the seal. If all three phases are low in front of the meter cover, the report goes to the distribution company. We do not open the seal. The instrument is a True-RMS clamp. An average-responding clamp writes low on a harmonic neutral and makes the stage board look healthy. The reading is taken under load. Zero amperes in an empty flat is not a diagnosis.
The hob circuit leaves the socket branch. The NYM section in the wall is measured. If the section cannot carry the load, the conductor is renewed. If the section is enough, only the phases are redistributed, and the breaker rating is not increased on paper. An induction hob and an inverter air conditioner produce pulsating direct residual current. A Type AC device can be blind to that residual. Flat sockets and the hob circuit are protected with a 30 mA Type A residual-current device. A bridged device is removed. The bridge is not left as a diagnosis. The Schneider or Siemens rail already standing in the estate main board is followed. A sound enclosure is not broken just to change the brand. If the feed between blocks is NYY, it stays in the duct and is not mixed with the NYM inside the flat. Hospital compensation and a shopping-mall transformer are not the subject of this visit. The paper that is written is the stage, the block, the floor and the amperes of the three phases.
In one Kayaşehir stage, hundreds of LED drivers, phone adapters and inverter air conditioners return to the same neutral bar. Triplen harmonics do not cancel in the neutral. They add. Neutral current can exceed the current of the heaviest phase. An average-responding clamp shows that low. A True-RMS clamp writes the neutral and each phase separately. If the neutral-bar screw is loose, contact resistance rises, the bar heats, and lamps flare in one flat and die in the next. This is not the same sentence as an open neutral on old cloth cable. Here the conductor is new, the common bar is thin, and the stage was gathered on one screw. The screw is tightened. If the section is short, the neutral conductor is enlarged. The heat is not hidden by enlarging a phase breaker. How many neutral amperes were read in which block is left in writing with the manager.
The common estate board carries the booster-pump contactor and the generator transfer switch. The generator is not started because a flat lamp went out. Which source the transfer switch is fed from is written down, and the side before the meter seal is a separate line. If the pump has lost one phase, the motor heats. The missing phase is shown at the contactor output with a True-RMS clamp, and the motor is not blamed before that reading. The intercom bus and the camera supply are not left on a socket way of this common board. A separate branch is pulled for the cameras, so the recorder does not carry the kitchen phase's neutral heat. Cat6 ends are proved with a cable tester. An end left because the picture came up once drops the recorder the following week as well. If the in-stage duct is closed, the camera cable does not go through finished plaster. It goes through the existing shaft or halogen-free trunking.

If the BEDAŞ seal is intact and the meter body is cold while the voltage is unbalanced only inside the flat, the riser terminal and the flat board are measured. If the seal is already broken, or the meter side is warm, a company report is opened. We do not imitate a seal. The riser belongs to the building. Blackening inside one flat's cover is a sign that the common screw on the same floor may be loose as well. The note left with the manager carries the stage name, the block, the phase colour and the amperes. The flat owner does not have that screw undone alone. The generator room and the estate transformer's cubicle are a locked area of the distribution company or the estate operator. If there is no key, that door is not forced. Our boundary is the conductor from the meter output to the socket.
A Başakşehir call is tied to an appointment time. A burning neutral, a terminal that arcs and a chassis that shocks are written at the front of the same day. No minute figure is set for the barrier, the car-park barrier arm or the one-way road inside the stage. Before setting off, the technician separates on the phone whether measurement and repair will finish in the same visit. The 2026 labour band excludes materials and narrows on site: fault finding 750-1,500 TL, a breaker or a 30 mA Type A device 1,250-3,200 TL, a socket 650-2,800 TL, a dedicated hob or air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL. NYM, the rail and the device body sit outside that range. The survey comes off the labour if the repair is accepted. The binding amount is on paper after the phase currents are written and before work starts. Workmanship on the joints we make is one year. A hospital or shopping-mall board is not folded into this band.
In most blocks the stage intercom is fed from a socket in the weak-current room. That socket is on the same phase as the kettle circuit in the security cabin. When the kettle and the induction hob draw together, the intercom transformer heats, the door does not release, and the screen in the flat goes dark. If the transformer body is warm, the intercom leaves the socket branch and is put on its own thin pair. A camera adapter is not added to that thin pair. The cameras have their own breaker, the intercom has its own breaker, and the kitchen is a third way. The three are not placed behind one 16 ampere breaker. An adapter fault then does not drop the hob and the door speech together. The ends are labelled. Without a label the next crew ties a kettle to the same socket again.
If the weak-current room is damp, the adapter body sweats and a 30 mA Type A device can trip at night. The device is not bridged. The adapter is moved to its own way, and the socket circuit's insulation is read with a 500 V megohmmeter when that is needed. A branch under one megaohm is not connected behind the new device. The new device would feed rotten insulation and it would trip again. This reading is made in the estate's own weak-current cupboard, not in a hospital room. The cupboard is opened with the manager. When the measurement is finished the cover is closed, and a temporary extension lead is not left in the cupboard. An extension left behind is next month's smell of fire.
At the stage handover the two were tied to the same phase. When they draw together in the evening that phase's breaker fills and the other phases stay empty. The meter output and the flat breaker are written separately with a True-RMS clamp. If the pile-up is after the seal, the phases are separated, and if the section is short the NYM is renewed. The ampere rating is not increased before the section is measured. A hospital load is not folded into this sum.
No. The transformer cubicle and the hospital operation sit outside this job. The sealed meter is a BEDAŞ report, and we do not open the seal. The flat board after the meter, the branches, the intercom and the camera circuit are our measurement. If the whole stage is low in front of the meters, the company is called, and the flat board stays on the same paper as its own line.
Harmonic current from LED drivers and adapters adds in the neutral. Neutral current can exceed one phase's current. An average clamp misses it, and a True-RMS clamp writes it. A loose screw is tightened, and if the section is thin the neutral is enlarged. Enlarging the phase breaker hides the heat. It does not put it out.
They are not. The intercom is on its own thin pair, the cameras have a separate breaker, and the hob is a third way. If the three stand behind one 16 ampere breaker, one adapter fault drops the door and the hob together. The ends are proved with a cable tester and labelled. An extension lead is not left in the weak-current cupboard.
The published range is labour, excluding materials. Finding a fault is 750-1,500 TL, a device or breaker 1,250-3,200 TL, a socket 650-2,800 TL, a hob or air-conditioning circuit 2,400-5,500 TL, a flat board 6,500-16,000 TL. The amount is written after measurement and before work starts. A duration figure is not inside that amount. Workmanship is one year.
Başakşehir on the European side is worked by appointment. A burning smell, arcing or a shock is moved ahead the same day; no minute is promised, because a time that cannot be held in bridge traffic helps nobody. A night or holiday difference is stated on the phone before departure.

A loose screw connection has carbonised the terminal. Take that outlet out of service at once; the point is found with a thermal camera without opening the wall.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Branches are separated one by one at the board and the device reset; if it holds the fault is in the wiring, if not it is the device. The faulty leg is confirmed with a megohmmeter.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
If the building is dark, the record belongs to 186. If only the flat is dark, the fault is after the meter: one phase is missing or the neutral has broken. On neutral loss one phase climbs above 250 volts and another falls to 180.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
Inrush exceeds the existing circuit. The fix is not a bigger breaker but a dedicated run from the board with a motor characteristic device.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
The chandelier is fixed to the existing box and a load-rated hook. If the hook is not anchored in the slab, it is not hung. Live, neutral and earth are confirmed separately; the body is never put on phase.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and price
There is no protective earth and the neutral is bridged to the earth terminal in the socket. This is a lethal risk; stop using the appliance immediately.
Diagnosis sits in the 750–1,500 TL band. The job line is written from the 2026 table after measurement.
Fix and priceOn Başakşehir call-outs the team follows the sequence below. No arrival minute is promised. The technician's name is given on the phone before anyone sets off.
The bands below are the labour ranges actually seen on recent call-outs and exclude materials. The binding figure is given in writing after on-site measurement, and no work starts without approval.
| Job | Typical price range | What is included |
|---|---|---|
| Fault diagnosis and measured survey | 750 TRY – 1,500 TRY | Diagnosis with a True-RMS clamp, megohmmeter and thermal camera; the survey fee is deducted if the repair is accepted. |
| Breaker / RCD replacement | 1,250 TRY – 3,200 TRY | A 30 mA Type A device; varies with the number of ways and whether Schneider or Siemens is specified. |
| Dedicated air conditioning circuit | 2,400 TRY – 5,500 TRY | 3x2.5 or 3x4 mm² solid copper with a C20-C25 breaker; varies with run length and trunking route. |
| Flat board renewal (modular DIN) | 6,500 TRY – 16,000 TRY | Varies with room count, circuit splitting and whether a surge arrester is included. |
| Chandelier, spot and socket installation | 650 TRY – 2,800 TRY | Priced per unit; heavy chandeliers include a steel anchor set into structural concrete. |
| Internet and Cat6 data cabling | 1,100 TRY – 4,200 TRY | Includes a Cat6 run per room, an RJ45 data outlet and verification with a cable tester. |
| Factory / power factor periodic maintenance | 4,500 TRY – 18,000 TRY | By panel and step count; includes a thermal sweep and a written measurement report. |
Prices are estimated labour ranges and exclude materials. A binding quote is issued in writing after the technician measures on site and before any work begins. Last updated: October 2026.
Whatever we are called out for, before leaving we measure your board at five points and leave the result in writing. It is the cheapest way to see a developing fault before it stops anything.
All breaker and terminal temperatures under load with a FLIR thermal imager; every point above seventy degrees is recorded.
The 30 mA residual current device trip time measured in milliseconds with a dedicated tester.
Voltage between neutral and earth; more than a few volts indicates a loose neutral or a bootleg ground.
Earth resistance read with a digital earth tester and assessed against the 2 Ohm target.
Breaker ratings against conductor size; anything above a C16 on a 1.5 mm² run leaves the cable unprotected.
Fully stocked mobile vans: every vehicle carries Schneider and Siemens breakers, 30 mA Type A devices, surge arresters, solid copper cable drums and junction box sets, so most jobs finish on the same visit.
Service covers the neighborhoods of Istanbul's 39 districts. Not the whole of Turkey. A survey is not a binding quote.
10 / 10 · Residential neighborhoods sit first.
Google Review
Your review is how neighbours searching for an emergency electrician in your area find us. One tap opens the Google review page; there is no account to create and no form to fill in.
Current rating: 5.0 / 5.0 · 2 verified reviews
Leave 5★ On Google